Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Annual Maintenance Of Opgw Of Different Sizes Viz. 8/12/24/48/96 Fibre Opgw Strung On 400/220/132k V Transmission Line Towers Or Laid Underground Located In Different Parts Of Mp Including Maintenance Of Approach Cable, Fodp Etc. And Opgw Stringing Wo
|
| Description |
Annual Maintenance Of Opgw Of Different Sizes Viz. 8/12/24/48/96 Fibre Opgw Strung On 400/220/132k V Transmission Line Towers Or Laid Underground Located In Different Parts Of Mp Including Maintenance Of Approach Cable, Fodp Etc. And Opgw Stringing
|
| Organisation | MP Power Transmission Co. Ltd. | State Govt. and UT |
| Tender Id | 2025_MPPTC_436221_1 |
|
Reference Number |
MT-269/2025 |
| Tender Fee | 13334 |
| EMD | 5.35 Lakh |
| Tender Value | - |
| Place | Jabalpur |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=515394 |
| Start Date | July 30, 2025 16:00 |
| End Date |
Expired
18/08/2025
Expired 404 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Splicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.
Splicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.
Read moreSplicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.
Splicing of opgw of different size viz. 8/12/24/48 fibre opgw strung on 400/220/132kv transmission line towers located in different parts of mp, termination and end to end otdr testing of the opgw link before and after splicing as per requirement.
Read morePainting of different 132kv towers under the jurisdiction of ashokenagar 132kv sub-stations under barasat area office, wbsetcl
Painting of different 132kv towers under the jurisdiction of&#x0d ashokenagar 132kv sub-stations under barasat area office, wbsetcl
Read moreConstruction work of associated line of 132kv d/c overhead line (1.5km) and underground cable (1.5km) from 132kv gss daizer with opgw of complete line including stringing of conductor, detailed route survey, laying and installation of cable alongwith
Construction work of associated line of 132kv d/c overhead line (1.5km) and underground cable (1.5km) from 132kv gss daizer with opgw of complete line including stringing of conductor, detailed route survey, laying and installation of cable alongwith
Read moreUpgradation/stabilisation of existing ehv transmission line infrastructure by way of stringing of conductor at various locations of 132kv dc habbak cheshmashahi tl along with fixing of missing members of towers of 132kv dc pampore cheshmashahi tl
Upgradation/stabilisation of existing ehv transmission line infrastructure by way of stringing of conductor at various locations of 132kv dc habbak cheshmashahi tl along with fixing of missing members of towers of 132kv dc pampore cheshmashahi tl
Read moreLaying of tower foundations, erection of towers, stringing and sagging of conductor for shifting of 132kv science city kapurthala line on jalandhar kapurthala railway section at km 14/4-5
Laying of tower foundations, erection of towers, stringing and sagging of conductor for shifting of 132kv science city kapurthala line on jalandhar kapurthala railway section at km 14/4-5
Read moreLaying of tower foundation , erection of towers,stringing and sagging of conductor for shifting of 132kv jamalpur-goraya line tower no. 63-64 on phillaur-partappura railway section km 2/4-5.
Laying of tower foundation , erection of towers,stringing and sagging of conductor for shifting of 132kv jamalpur-goraya line tower no. 63-64 on phillaur-partappura railway section km 2/4-5.
Read moreLaying of tower foundation, erction of towers,stringing and sagging of conductor for raising of 132kv nakodar noormehal line. tower no. 11-12 on shankar nakodar railway section km 27/7-8
Laying of tower foundation, erction of towers,stringing and sagging of conductor for raising of 132kv nakodar noormehal line. tower no. 11-12 on shankar nakodar railway section km 27/7-8
Read moreLaying of tower foundation,erection of towers,stringing and sagging of conductor for shifting of 132kv khera mandir-noormehal line no. 61-62 on dadwandi-sultanpur lodhi railway section km 38/6-7
Laying of tower foundation,erection of towers,stringing and sagging of conductor for shifting of 132kv khera mandir-noormehal line no. 61-62 on dadwandi-sultanpur lodhi railway section km 38/6-7
Read moreof your Industry type