Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Improvement And Cement Concrete Work Of Saung Khalidhar Light Vehicle Road In Kapkot Constituency District Bageshwar Under State Sector
|
Description |
Improvement And Cement Concrete Work Of Saung Khalidhar Light Vehicle Road In Kapkot Constituency District Bageshwar Under State Sector
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 5900 |
EMD | 8.3 Lakh |
Tender Value | |
Place | Kapkot |
Link |
AAAAAAAAAA Login to view |
Start Date | June 20, 2025 15:30 |
End Date |
30/06/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreE.l.d.c.no/smii/p5/1233/2024 selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9
Selection of concessionaires for assigning the advertisement rights for centre medians and street light poles in brr in gcc on ppp mode under 4 packages package 3 zones 6 and 9&#x0d
Read moreEngineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section
Read moreLandslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work of 05 locations ch.298.360-ch.298.750, ch.304.120-ch.304.350, ch.304.870-ch.305.050, ch.312.190-ch.312.230 and ch.333.000-ch.333.100 on nh-07 (old nh-58) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreRepair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structures) with 5 year maintenance under nabard loan/mc/mb fund distt jalandhar
Repair of various rural link roads in mc nurmahal (compaction of earth work to 20 mm thick open graded pc with seal coat and construction of culverts,side drain and road structure) with 5 year maintenance under nabard loan/mc/mb funds distt jalandhar
Read moreWbphed/ee/md/niet_21 (2nd call) of 2025-2026, sl. no.27
Augmentation work of boundary wall, pump house and construction pathway approach road at head work site of jatradanga water supply scheme of old malda block under malda division, p.h.e.dte. in the district of malda. (2nd call)
Read moreOld nh 34 road - stregthening work
Old nh 34 road - stregthening work - from 95.10 kmp to 97.80 kmp and 111.90 kmp to 112.40 kmp effective length - 2310.00 m under nadia division, p.w.d. in the district of nadia, west bengal
Read moreof your Industry type