Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Flushing Header Of Bottom Ash Hopper Fitted With Flushing Header Nozzles,Flishing Apparatus For Eco
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2025/B/5970058 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | February 21, 2025 21:09 |
| End Date |
Expired
21/03/2025
Expired 572 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Ttps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Ttps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Read moreTtps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Ttps mech ii bm unit iii replacement of wornout supports of eco hoppers inspection of water wall ring headers removal of debris and strengthening of economizer inlet header eco intermediate header steam cooled wall header no 8 and ltsh inlet header d
Read moreSelf cleaning idlers for bac,return flat idlers for bottom ash conveyors,carrying idlers for bottom ash conveyors
Self cleaning idlers for bac,return flat idlers for bottom ash conveyors,carrying idlers for bottom ash conveyors
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreRectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - 3x210 mw atps anpara overhauling of flushing apparatus jetting nozzles, valves, nozzle etc of esp system during annual overhauling of unit # 2, 3x210 mw, atps, anp..
Read moreProcurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Procurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreProcurement of weir minerals make spares of ash slurry series and bottom
Procurement of weir minerals make spares of ash slurry series and bottomash overflow pumps at stage 2 ntpc barauni
Read moreof your Industry type