Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Ttps Mech Ii Bm Unit Iii Boiler Overhaul 🛠️ Tneb Limited, A State Government Undertaking, Is Initiating A Tender For The Renewal Of Damaged High Pressure (Hp) Valves And The Replacement Of Worn Out Boiler Tubes In The Steam Feed Water Lines Of Boiler Unit Iii At Ttps, Scheduled For The Overhaul Period Of 2024 2025. 📅 Bid Submission Deadline: July 18, 2024, 2:00 Pm A Tender Fee Of Inr 3800/ Is Applicable, With No Emd Required. Interested Bidders Must Possess The Necessary Technical Expertise And Experience In Handling Such Critical Components Of A Boiler System. Detailed Proposals, Including Methodology, Pricing, And Timelines, Are To Be Submitted In Accordance With The Tender Specifications. Keywords: Tneb Limited, Ttps Mech Ii Bm Unit Iii, Boiler Overhaul, High Pressure Valves, Boiler Tubes, State Government Undertaking, Tender, Renewal, Replacement, Steam Feed Water LinesParticulars | Details |
---|---|
Title |
Ttps Mech Ii Bm Unit Iii Renewal Of Damaged Hp Valves And Worn Out Boiler Tubes In Steam Feed Water Lines Of Boiler During The Overhaul 20242025
|
Description |
Ttps Mech Ii Bm Unit Iii Renewal Of Damaged Hp Valves And Worn Out Boiler Tubes In Steam Feed Water Lines Of Boiler During The Overhaul 20242025
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_459320_1 |
Reference Number |
CE/TTPS/SE/M-II/No.289/2024-25 |
Tender Fee | 0 |
EMD | 3800 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=545997 |
Start Date | July 02, 2024 23:30 |
End Date |
18/07/2024 ( Expired 338 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp
Service contract for refractory and insulation work de insulation and re insulation with sheet cladding work of different portion of boiler area different ducts pipe lines and valves etc under bmii dept during unit 3 overhauling at sgtpp&#x0d &#x0d &#x0d
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 1 and 2 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul
Ttps operation circle mpm i unit iii emptying of coal from rc bunkers 3a to 3f, clearing collecting, loading, transporting and dumping the coal at coal yard ttps during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Ttps operation circle mpm i unit iii overhauling of worn out fuel inlet elbows special bends coal pipes and orifices in boiler corner 3 and 4 during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills a, b and c and boiler during the forthcoming overhaul
Read moreTtps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Ttps operation circle mpm i unit iii replacement of eroded coal pipe lines, bends and fittings between mills d, e and f and boiler during the forthcoming overhaul.
Read moreMtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Mtps i mill plant unit i complete dismantling of mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub mill bottom etc in mill 1a
Read moreNctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Nctps i es circle em ii dn sdn i unit iii overhauling of ht pa fan motor 3a sl no 32277 p 401 02 01 at boiler area 0 mtr and complete cleaning and maintenance of ht motors 11 nos to be carried out during the annual overhauling work of unit iii
Read moreRepairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Repairing of pipe line used for supply of water from 6 pit bararee to 1 no. colony and bazar dhowra under bararee section total section of pipeline to be repaired damaged and worn out pipe is 120 mrt 4 inch dia m.s. pipe and changing/replace 4 in
Read moreMtps i bm unit i aoh 2025 26 replacement of the worn out shaft and other related works in pa fan 1a
Mtps i bm unit i aoh 2025 26 replacement of the worn out shaft and other related works in pa fan 1a
Read moreof your Industry type