Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Lumsum Amount Including Gst For Providing Expert Services For Hot Tapping
|
| Description |
|
| Organisation | Bharat Petroleum Corporation Ltd | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5554604 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 28, 2024 20:38 |
| End Date |
Expired
18/11/2024
Expired 693 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Water supply improvement scheme (phase-i) in nalgonda municipal corporation under tufidc assistance (amount of estimate : rs.8300.00 lakhs)
Water supply improvement scheme (phase-i) in nalgonda municipal corporation under tufidc assistance (amount of estimate : rs.8300.00 lakhs)
Read moreSelection of an implementation vendor for design development deployment and manage support of an ai/ml based gst risk analytics platform
Selection of an implementation vendor for design development deployment and manage support of an ai/ml based gst risk analytics platform
Read moreSupply of control damper assembly for mill hot primary air of unit-xi boiler
Supply of control damper assembly for mill hot primary air of unit-xi boiler
Read moreProcurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Procurement of electrical spares for high pressure hot water/steam jet washing/cleaning machine working at shovel section, ocp3, rg2.
Read moreConstruction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Construction of hot dipped galvanized iron chain link mesh or compound wall of r and b circuit guest house in mahabubnagar district.
Read moreProviding 04 (four) nos technical expert on outsource basis, in order to implementation (pmay) housing for all scheme in shivamogga at (city level technical cell), and 2 (two) computer operators / data entry operators to dudc.dc.office, shivamogga(for the year 2027)
Providing 04 (four) no technical expert on outsource basis, in order to implementation (pmay) housing for all scheme in shivamogga at (city level technical cell), and 2 (two) computer operators / data entry operators to dudc.dc.office, shivamogga(for the year 2027)
Read moreDeputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Deputation of service engineer for inspection and to find out any complaints for the belt pro make hot vulcanizing machines in mm/chp/ktps v and vi stages.
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type