Tender Details

Particulars Details
Title
Repairing Of Defective Roof Extractor Fan And Reinstallation At Site As Per Annexure A
Description
Organisation Department of Defence Production | Ministry of Defence
Tender Id GEM/2023/B/4278255
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://gem.gov.in/

Start Date December 02, 2023 15:11
End Date
Expired 13/12/2023

Expired 1040 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: cancelled
Ministry: Ministry Of Defence
Department: Department Of Defence Production
Organisation: Yantra India Limited

Technical Evaluation Results

S.No. Seller Name Offered Item Participated On EMD Status MSE/MII Status Status
1 M/s A.M. TRADERS & ENGINEERS Make : NA Model : REPAIRING OF DEFECTIVE ROOF EXTRACTOR FAN Title : REPAIRING OF DEFECTIVE ROOF EXTRACTOR FAN AND REINSTALLATION AT SITE 12-12-2023 20:32:48 Registered with designated Agency / Authority MII N/A Disqualified
2 M/S AGNI AUTOMATION AND SECURITY Make : Branded Model : ROOF EXTRACTOR Title : ROOF EXTRACTOR 12-12-2023 21:40:50 Registered with designated Agency / Authority MII N/A Qualified
3 M/S K L ENTERPRISES Make : Branded Model : ROOF EXTRACTOR Title : ROOF EXTRACTOR 12-12-2023 17:15:03 Registered with designated Agency / Authority MII N/A Disqualified
4 M/S SHRI RAMA CONSTRUCTION Make : UNBRAND Model : REPAIRING OF DEFECTIVE ROOF EXTRACTOR FAN AND REIN Title : REPAIRING OF DEFECTIVE ROOF EXTRACTOR FAN AND REINSTALLATION AT SITE AS PER ANNEXURE-A ( Q3) 07-12-2023 11:53:43 Central / State PSUs MII N/A Qualified
5 Mectronics India Make : NA Model : ROOF EXTRACTOR Title : ROOF EXTRACTOR 12-12-2023 18:45:42 Registered with designated Agency / Authority MII N/A Disqualified
Similar Tenders
Annual maintenance contract of heavy-duty roof extractor fan installed at shell, furnishing & lhb division for a period of three years.

Annual maintenance contract of heavy-duty roof extractor fan installed at shell, furnishing & lhb division for a period of three years.

Read more
Dynamically balancing work at site of boiler i d fan,dynamically balancing work at site of boiler f d fan,dynamically balancing work at site of boiler s a fan,dynamically balancing work at site of baggase blower fan,dynamically balancing work at site of fibrizer,dynamically balancing work at site of leveller,dynamically balancing work at site of continuous cfg machine b 1500,dynamically balancing work at site of continuous cfg machine c after 1350,dynamically balancing work at site of continuous cfg machine c 1350,dynamically balancing work at site power turbine with alternator,thickness testing of molassses tank

Dynamically balancing work at site of boiler i d fan,dynamically balancing work at site of boiler f d fan,dynamically balancing work at site of boiler s a fan,dynamically balancing work at site of baggase blower fan,dynamically balancing work at site of fibrizer,dynamically balancing work at site of leveller,dynamically balancing work at site of continuous cfg machine b 1500,dynamically balancing work at site of continuous cfg machine c after 1350,dynamically balancing work at site of continuous cfg machine c 1350,dynamically balancing work at site power turbine with alternator,thickness testing of molassses tank

Read more
Set of flexible roof connection consisting of 3 items as per attached annexure.

Set of flexible roof connection consisting of 3 items as per attached annexure.

Read more
Dtc timber stefab drying tumbler,xt 56 timber stefab drying tumbler,heater washing machine stefab,fan belt washing machine marks,gate valve 2 inch,gate valve 1 inch,fan belt hydro extractor marks,grease white arb,rubber gloves 10 inch,rope glind,spring hydro extractor stefab,fan belt drying tumbler stefab,3 phase contractor 40 amp,cork sheet

Dtc timber stefab drying tumbler,xt 56 timber stefab drying tumbler,heater washing machine stefab,fan belt washing machine marks,gate valve 2 inch,gate valve 1 inch,fan belt hydro extractor marks,grease white arb,rubber gloves 10 inch,rope glind,spring hydro extractor stefab,fan belt drying tumbler stefab,3 phase contractor 40 amp,cork sheet

Read more
Dismantling and reinstallation of existing 20kwp grid connected rooftop solar power plants including solar pv modular, installed on roof of chancer bhaga girls hostel building at hp university, shimla-5

Dismantling and reinstallation of existing 20kwp grid connected rooftop solar power plants including solar pv modular, installed on roof of chander bhaga girls hostel building at hp university, shimla-5

Read more
In mallahi tola pratham, at vishwas nagar, repair of the roof and floor at dr. b.r. ambedkar statue site, and beautification with granite, etc.

In mallahi tola pratham, at vishwas nagar, repair of the roof and floor at dr. b.r. ambedkar statue site, and beautification with granite, etc.

Read more
In sheetla devi ward, at naubasta, work for repairing the roof and floor of dr. b.r. ambedkar statue site and beautification with granite, etc.

In sheetla devi ward, at naubasta, work for repairing the roof and floor of dr. b.r. ambedkar statue site and beautification with granite, etc.

Read more
(azadnagar campbell road, balaganj) at dr. b.r. ambedkar ji statue site in garhipir khol ward, work for beautification including roof, floor repairs, and granite, etc.

(azadnagar campbell road, balaganj) at dr. b.r. ambedkar ji statue site in garhipir khol ward, work for beautification including roof, floor repairs, and granite, etc.

Read more
In balaganj ward, on hari nagar bari road, work for the beautification of dr. b.r. ambedkar statue site with roof, floor repairs, and granite etc.

In balaganj ward, on hari nagar bari road, work for the beautification of dr. b.r. ambedkar statue site with roof, floor repairs, and granite etc.

Read more
At kanhaiya madhoupur second ward in faridipur, repair work on the roof and floor of dr. b.r. ambedkar statue site, and beautification using granite, etc.

At kanhaiya madhoupur second ward in faridipur, repair work on the roof and floor of dr. b.r. ambedkar statue site, and beautification using granite, etc.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise