Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rectification And Rehabitation Of Damage Bridge And Expansion Joint With Replacement Of Sign Board Of Nh 57 (Km. 0.000 To 287.860) 4th Call.
|
| Description |
Rectification And Rehabitation Of Damage Bridge And Expansion Joint With Replacement Of Sign Board Of Nh 57 (Km. 0.000 To 287.860) 4th Call.
|
| Organisation | Central Public Procurement Portal 2 |
| Tender Id | 2023_NHAI_174875_1 |
|
Reference Number |
NIT No- 226/RO-PATNA/NHAI/2023-24 |
| Tender Fee | 25000 |
| EMD | 8.61 Lakh |
| Tender Value | |
| Place | NHAI, RO - Patna |
| Link |
View Original Tender Notice
https://etenders.gov.in |
| Start Date | November 18, 2023 19:40 |
| End Date |
Expired
07/12/2023
Expired 927 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Four laning rohtak to hisar section of nh-09 (from km.93.140 to 169.000) including connecting link from km.0.000 to 9.450 in the state of haryana - development of nhai bee corridor, replacement of older median plantation, casualty replacement
Read moreRepair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Repair and rehabilitation of deopani bridge at km 5.824 construction of rcc covered drains and installation of ms railings on the meka roing section from km 0.00 to km 6.124 of nh-313
Read moreRectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Rectification of defects on the project construction of vup with re wall, approaches and service road at km 216.900 along with widening to 6-lane at bharuch-surat section of nh-48 in gujarat on epc mode at risk and cost of existing contractor
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreReconstruction and repair of major bridge on dhadhar river at km. 180/000 to 180/400 on nh-64 in bharuch district in the state of gujarat on epc mode
Reconstruction and repair of major bridge on dhadhar river at km.
 180/000 to 180/400 on nh-64 in bharuch district in the state of
 gujarat on epc mode
Read moreRectification and rehabitation of damage bridge and expansion joint with replacement of sign board of nh -57 (km. 0.000 to 287.860)3rd call.
Rectification and rehabitation of damage bridge and expansion joint with replacement of sign board of nh -57 (km. 0.000 to 287.860)3rd call.
Read moreRectification and rehabitation of damage bridge and expansion joint with replacement of sign board of nh- 57 (km. 0.000 to 287.860) 2nd call.
Rectification and rehabitation of damage bridge and expansion joint with replacement of sign board of nh- 57 (km. 0.000 to 287.860) 2nd call.
Read moreRectification and rehabitation of damage bridge and extantion joint with replacement of sing board of nh - 57 (km. 0.000 to 287.860).
Rectification and rehabitation of damage bridge and extantion joint with replacement of sing board of nh -57 (km. 0.000 to 287.860).
Read moreRoad safety work at muzaffarpur - darbhanga- purnea section of nh -57 (km. 0.00 to 287.860 in the state of bihar.
Road safety work at muzaffarpur - darbhanga- purnea section of nh -57 (km. 0.00 to 287.860 in the state of bihar.
Read moreSltf-removing and refixing existing expansion joint of thanni bridge in kollam district.-premonsoon 2023-24 rectification of expansion joint.-general civil work
Sltf-removing and refixing existing expansion joint of thanni bridge in kollam district.-premonsoon 2023-24 rectification of expansion joint.-general civil work
Read moreof your Industry type