Particulars | Details |
---|---|
Title |
Re Construction Of Damaged Portion Of Boundary Wall Length 20 Mtr And Raising Height Of Existing Boundary Wall 12 Mtr At Rear Side Of Sewage Treatment Plant At Stc Bsf Bangalore.
|
Description |
Re Construction Of Damaged Portion Of Boundary Wall Length 20 Mtr And Raising Height Of Existing Boundary Wall 12 Mtr At Rear Side Of Sewage Treatment Plant At Stc Bsf Bangalore.
|
Organisation | DG,BSF,MHA | Central Govt. Ministry/Department |
Tender Id | 2025_BSF_845179_1 |
Reference Number |
905/Engg/2024-25/1030-33 |
Tender Fee | 0 |
EMD | 10407 |
Tender Value | |
Place | STC BSF Bangalore |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=888419 |
Start Date | January 20, 2025 14:30 |
End Date |
27/01/2025 ( Expired 143 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex
Read moreModification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower...
Modification of chain link fencing into security boundary wall and raising the height of entire wall (860 mtrs) from 08 feet to 12 feet and reconstruction of existing low security chain link fencing to high security boundary wall with watch tower ...
Read moreUpgradation of boundary wall at nsic technical services centre (ntsc), okhla and raising height of boundary wall around zonal green area falling in nsic complex at okhla, new delhi.
Upgradation of boundary wall at nsic technical services centre (ntsc), okhla and raising height of boundary wall around zonal green area falling in nsic complex at okhla, new delhi.
Read moreConstruction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex
Construction of buttress wall at the toe of existing waste dump of 11ml (200 mtr length) dep 11c mines biom kirandul complex
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreConstruction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex
Construction of buttress wall at the toe of existing waste dump of 14 mnz ml 1066 mb 150 mtr length at dep 11c biom kirandul complex
Read moreConstruction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Read moreProvision of leftover portion of boundary wall and special repair to existing boundary wall around 324.07 acres of land at village jaydevkasba, pxe chandipur
Provision of leftover portion of boundary wall and special repair to existing boundary wall around 324.07 acres of land at village jaydevkasba, pxe chandipur
Read moreHeight raising of plant boundary wall near guard pond (approx 150 meter long) and supplying, fitting, fixing of rbt concertina fencing on boundary wall at different locations, stps.
Height raising of plant boundary wall near guard pond (approx 150 meter long) and supplying, fitting, fixing of rbt concertina fencing on boundary wall at different locations, stps.