Proper operation of cooling system of 40mva transformer ii tal make at 132kv substation chhanbey under etd mirzapur
UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT · Mirzapur
- EMD
- ₹1,000
- Tender fee
- ₹590
This tender closed on 22 Jul 2025. 5 tenders like it are open now.
Open tenders like this
-
For complete rectification work of alstom make sas system installed at 132kv substation rasoolabad, under etd-i kanpur
UP Power Transmission Corp.Ltd (Operation) | Chief Engineer (TS) South Agra | S.E. ETC-I Kanpur · Uttar Pradesh Closes 2 Dec 2026
View tender -
Providing and installation of cooling fans on Transformers to prevent overheating at 66 KV Substation Thithki
MD (Power Transmisison Corporation of Uttarakhand Limited) | C.E.(O/M) Garhwal Zone Roorkee | SE (O/M) Roorkee · Uttarakhand Closes 15 Dec 2026
View tender -
Increasing Capacity of 132kV GIS Substation BSR II Ghaziabad 2x40 MVA to 3x40 MVA including construction of 01 nos 145kV GIS Transformer Bay 01 nos 36kV GIS Transformer Bay and complete SCADA Integration
U.P. Power Transmission Corporation Ltd. | Transmission HQ | SE Electy Substation Design Circle IInd · Uttar Pradesh Closes 26 Nov 2026
View tender -
Complete erection work of 01 No. 132KV and 01 No. 33KV feeder bay for additional 50MVA Transformer at 220KV substation Malanpur under Testing Dn. I Gwalior
MP Power Transmission Co. Ltd. | MPPTCL.CE(T and C) | MPPTCL.400KV S/s CIRCLE KHANDWA · Madhya Pradesh Closes 25 Nov 2026
View tender
Tender details
- Tender ID
- 2025_UPTCL_1055937_1
- Reference number
- 09/2025-26/ETD/MZP
- Organisation
- UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT
- Location
- Mirzapur
- Bids open
- 10 Jul 2025, 1:00 PM
- Bids close
- 22 Jul 2025, 6:00 PM
- Tender value
- –
- EMD
- ₹1,000
- Tender fee
- ₹590
Source: https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tn...
Bid on the next proper operation of cooling system tender
Most bids fail on paperwork. Before the next one opens, we'll check your eligibility and get your registrations, digital signature (DSC) and documents ready.
More tenders like this
-
Turnkey package for Design Engineering Supply Installation Testing and Commissioning of Ten 10 No 15MVA 11 by 132KV Single Phase Transformers with OFWF type Cooling system to be connected in Delta Star (YNd11) configuration by 11KV single Co
JKSPDC | CE (Generation, Kashmir) | Generation Divn. LJHP Bla · Jammu and Kashmir Closes 2 Dec 2026
View tender -
Servicing and overhauling of oltc of transformer installed at 220kv substation mirzapur and 220kv substation chhanbey under etd mirzapur
UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT · Mirzapur Closed 16 Jun 2025
View tender -
Rewinding and overhauling of cooling fans and wiring work of marshaling box of 40mva transformer under etd mirzapur
UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT · Mirzapur Closed 16 Apr 2025
View tender -
For centrifuging of transformer oil of 40mva tranformer-i (alsthom make) installed at 132kv substation krishna nagar under etd-ii kanpur.
UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT · 132KV SUBSTATION KRISHNA NAGAR Closed 6 Dec 2024
View tender -
Centrifuging of old transformer oil of 40MVA Transformer 1 at 132KV SS Naseerpur and Jasrana under ETD Firozabad
UP Power Transmission Corp.Ltd (Operation) | State Govt. and UT · ETD Firozabad Closed 16 Jan 2025
View tender -
Strengthening of neutral Earthing of different Transformers at 220 KV Substation Mirzapur under ETD Mirzapur.
Government of Uttar Pradesh · Mirzapur Closed 10 Aug 2023
View tender