Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fiber Optic Post ( Material For Crown Build Up In Teeth )
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106524816 |
|
Reference Number |
HB246930 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/106524816/viewNitPdf_4772728.pdf |
| Start Date | November 13, 2024 21:13 |
| End Date |
Expired
20/11/2024
Expired 583 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement of resonant, free-space electro-optic phase modulator for single photons in the visible range with all required accessories
Procurement of resonant, free-space electro-optic phase modulator for single photons in the visible range with all required accessories
Read moreTooth spacing k value checking go & no go gauge for bull gear 107 teeth (mating shaft pinion- 21 teeth) for wag-9 / wag-9 hc loco. size: go: 317.09/317.17 mm & no go (service limit): 316.49 mm. ref: rdso drawing no. sk.dp-3848. material: tool steel - is- 3748/90, hardness: 40/45 hrc and supply with calibration certificate. acceptable make: pex/ganapathy /pie /jyoti enterprises/ prasad only
For complete deion and other details, please refer to tender
Read moreMaterial supply in gp ragha chhoti for financial year 2026-27 for mnarega and other scheme
Material supply in gp ragha chhoti for financial year 2026-27 for mnarega and other scheme
Read moreBuilding material supply for rd and vbg ram g scheme in gram panchayat paparda for year 2026-27
Building material supply for rd and vbg ram g scheme in gram panchayat paparda for year 2026-27
Read moreRate contract for supply of construction material for the financial year 2026-27 in gram panchayat surera panchayat samiti dantaramgarh distt sikar
Rate contract for supply of construction material for the financial year 2026-27 in gram panchayat surera panchayat samiti dantaramgarh distt sikar
Read moreSupply of construction material rdpr scheme g-ram ji, sfc , ffc and other scheme for financial year 2026-27 in gram panchyat ghari
Supply of construction material rdpr scheme g-ram ji, sfc , ffc and other scheme for financial year 2026-27 in gram panchyat ghari
Read moreRate contract for material supply and equipment arrangement for works which is sanctioned in vb-g-ram-g/mnrega and gravikas and panchayati raj department all schemes for year 2026-27 for panchayat samiti khanpur at gram panchayat dahikeda
Rate contract for material supply and equipment arrangement for works which is sanctioned in vb-g-ram-g/mnrega and gravikas and panchayati raj department all schemes for year 2026-27 for panchayat samiti khanpur at gram panchayat dahikeda
Read moreRate contract for material supply and equipment arrangement for works which is sanctioned in vb-g-ram-g/mnrega and gravikas and panchayati raj department all schemes for year 2026-27 for panchayat samiti khanpur at gram panchayat jolpa
Rate contract for material supply and equipment arrangement for works which is sanctioned in vb-g-ram-g/mnrega and gravikas and panchayati raj department all schemes for year 2026-27 for panchayat samiti khanpur at gram panchayat jolpa
Read moreRate contract for material supply and equipment arrangement for works which is sanctioned in vb-g-ram-g/mnrega and gravikas and panchayati raj department all schemes for year 2026-27 for panchayat samiti khanpur at gram panchayat mauborda
Rate contract for material supply and equipment arrangement for works which is sanctioned in vb-g-ram-g/mnrega and gravikas and panchayati raj department all schemes for year 2026-27 for panchayat samiti khanpur at gram panchayat mauborda
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreof your Industry type