Tender Details
Particulars | Details |
---|---|
Title |
Construction At Sabdalpur Samsanghat Drain And Siri(step) At Bakhrabad In Bakhrabad Gp Under Kaliachak Iii Block, Malda. Sl.20
|
Description |
Construction At Sabdalpur Samsanghat Drain And Siri(step) At Bakhrabad In Bakhrabad Gp Under Kaliachak Iii Block, Malda. Sl.20
|
Organisation | Zilla Parishad | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 3000 |
EMD | 19545 |
Tender Value | |
Place | Kaliachak-III |
Link |
AAAAAAAAAA Login to view |
Start Date | June 04, 2025 23:00 |
End Date |
18/06/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of rrm protection wall at new tower no.: 04
Construction of rrm protection wall at new tower no.: 04 of 132 kv haflong-jiribam tl under powergrid haflong substation as per boq and instruction of engineer-in-charge
Read moreConstruction of concrete covered drain with soak pit form thakurtala of kanai pramanik to house of uttampramanik at khirishtala under keoradanga gp
Construction of concrete covered drain with soak pit form thakurtala of kanai pramanik to house of uttampramanik at khirishtala under keoradanga gp
Read moreConstruction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Construction of married accommodation of type-iii 04 qtrs (double storied), type-iv 04 qtrs (double storied) and cmi room at hq ce (p) sewak complex at dimapur in nagaland state under epc mode
Read moreAAAAAAAAAA
Login to viewConstruction of new marketing stall extention beside of gp office at aturia , mouza - aturia, jl no-101 san-no- xiii under baduria development block
Read moreAAAAAAAAAA
Login to viewConstruction of pucca drain from near aturia gp office to chayanika at aturia snasad no xii aturia gp under baduria block
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreRoad,drain and cross drain construction and repairing work at various places in ward no. 29
Road,drain and cross drain construction and repairing work at various places in ward no. 29
Read moreWidening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Widening and improvements from ml to dual two lane divided carriageway with paved shoulder at km 90/0-92/900 of thoppur- mettur -bhavani -erode road (sh-20) including construction of storm water drain and construction of additional high level bridge
Read moreConstruction of 50 bedded critical care block g plus 3 at malda medical college and hospital_malda _sitc of lift
Name of work construction of 50 bedded critical care block g_plus_3 at malda medical college and hospital_malda _ sitc of lift
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at nakrasota zone-38 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreof your Industry type