Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Thermoshrinkk Jointing Kit Suitable For Four Quad Derivation
Jointing Kit
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 78528236 |
Reference Number |
3324D0069-61573 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Navi Mumbai |
Link | https://www.ireps.gov.in/ireps/supply/pdfdocs/112024/78528236/viewNitPdf_4776686.pdf |
Start Date | November 19, 2024 15:38 |
End Date |
29/11/2024 ( Expired 197 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dye penetrant kit consisting of red dye penetrant, remover/ cleaner & developer in the ratio 1:4:4 in a set. visibility-type-ii, washability-method-c, sensitivity-level-2, as per rdso s specification no. m&c/ndt/105/2001 of april 2001 or latest. (each can capacity 500ml and content 400ml net) drawing & specification : as per annexure a.
For complete deion and other details, please refer to tender
Read moreConstruction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Construction works for multi modal integration and station plaza development for four stations in gujarat (surat, bilimora, vapi, bharuch) for mumbai-ahmedabad high speed rail project
Read moreSupply of 16 nos. telescopic (collapsible tower) vertical mast type portable led emergency lighting system with 0.75 kva genset (cpcb compliance) suitable for 6.4 hrs. continuous running
Supply of 16 nos. telescopic (collapsible tower) vertical mast type portable led emergency lighting system with 0.75 kva genset (cpcb compliance) suitable for 6.4 hrs. continuous running
Read moreIndependent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Independent engineer services during operation and maintenance period for four lane bhavnagar-talaja section of nh-51 (old nh-8e) from km 07.090 to km 53.585 (design ch. from km 6.945 to km 54.990) in the state of gujarat on ham (pkg-i)
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConsultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Consultancy services for the preparation of detailed project report (dpr) for the four lane bypass of nh
 stretch from km 44/600 to km 56/600 (thamarassery ghat) of nh-766 in the state of kerala.
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreIndependent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Independent engineering services for construction of four laning of areraj-bettiah starting from areraj (0.500) near sh-54 and terminating near village gurwalia biswas (41.080) at nh-727 of nh-139w in the state of bihar on ham mode
Read moreIndependent engineering services for construction of four lane from sahebganj (design.ch. km 44.650) to areraj (design.ch. km. 82.200) section of nh139w in the state of bihar on hybrid annuity mode.
Independent engineering services for construction of four lane from sahebganj (design.ch. km 44.650) to areraj (design.ch. km. 82.200) section of nh139w in the state of bihar on hybrid annuity mode.
Read moreProcurement of dsp enabled evaluation kit for speech, audio and video signal processing
Procurement of dsp enabled evaluation kit for speech, audio 
 and video signal processing
Read moreof your Industry type