Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Sabhamandap At Hanuman Mandir Tunki Tq.Sangrampur Under Mulbhut Suvidha
|
| Description |
Construction Of Sabhamandap At Hanuman Mandir Tunki Tq.Sangrampur Under Mulbhut Suvidha
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_PWR_920068_6 |
|
Reference Number |
E-TENDERNOTICENO.11-2023-24 |
| Tender Fee | 590 |
| EMD | 17000 |
| Tender Value | |
| Place | Office Of The Executive Engineer PWD Khamgaon |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | June 27, 2023 22:30 |
| End Date |
Expired
04/07/2023
Expired 1112 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Construction of two wheeler parking behind post office haridwar under kumbh mela 2027.
Read moreConstruction of drainage at mgr nagar in narasingarayanpettai
Construction of drainage at mgr nagar in narasingarayanpettai
Read moreUnder district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2
Under district prayagraj, construction of culvert on kachhwa drain in village issauta, lot no 2&#x0d
Read moreProvision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Provision of arboriculture and associated work at certain location at af station arjan singh under ge p af panagarh
Read moreConstruction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla
Construction of intermediate pumping stations ips including pl of sewer network rising main and allied works at baramulla
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreDetailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreExtension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Extension and new construction of staffs quarter and compound wall for p. h. sub-centre at mouza mangi, tq.- pandharkawada, dist.- yavatmal
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreof your Industry type