Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Pneumatic Pressure Comparator 40 Kpa,Hydraulic Pressure Comparator 20 Mpa,Hydraulic Pressure Comparat
|
| Description |
|
| Organisation | Department of Atomic Energy | PMO |
| Tender Id | GEM/2025/B/5789523 |
|
Reference Number |
|
| Tender Fee | |
| EMD | |
| Tender Value | |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 29, 2025 20:04 |
| End Date |
Expired
20/02/2025
Expired 490 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Pressure switch for low mr pressure ftrtipl part no.ft0051023-106 or kbi part no. i84649/06555
For complete deion and other details, please refer to tender
Read moreProcurement of hydraulic adapter etc., for track machine.
For complete deion and other details, please refer to tender
Read moreSupply and installation of standalone servo-pneumatic four point bending (4pb) system
Supply and installation of standalone servo-pneumatic four point bending (4pb) system
Read morePressure guard 300/250 kva of bio vacuum toilet system in train -18
For complete deion and other details, please refer to tender
Read moreRepair of float power take-off (pto) for be-1000-1 hydraulic shovel sl. no. 10214.
Repair of float power take-off (pto) for be-1000-1 hydraulic shovel sl. no. 10214.
Read moreRepair/ maint of pressure sand filter and connected item water supply at dgre rdc, manali.
Repair/ maint of pressure sand filter and connected item water supply at dgre rdc, manali.
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreof your Industry type