Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Irrigation Pipe Line From Pandhari Medium Project To Mouja Molvihir,Tq. Warud District, Amravati
|
Description |
Construction Of Irrigation Pipe Line From Pandhari Medium Project To Mouja Molvihir,Tq. Warud District, Amravati
|
Organisation | CE-Water Resources Dept. Amravati | State Govt. and UT |
Tender Id | 2025_CEWRA_1160810_1 |
Reference Number |
E-Tender Notice No.20 of 2024-2025 |
Tender Fee | 2860 |
EMD | 13000 |
Tender Value | |
Place | Warud |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2018714 |
Start Date | March 13, 2025 20:30 |
End Date |
20/03/2025 ( Expired 32 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read morePerformance based maintenance contracts pbmc estimate of katol to warud section of nh- 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance period
Performance based maintenance contracts pbmc estimate of katol to warud section of nh_ 353j from existing km 60.100 to 101.085 from design km 60.100 to km 100.565 project length 35.935 km in the state of maharashtra for 5 year maintenance per
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreConstruction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn
Read moreConstruction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreConstruction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar
Construction of cc drain from imam chowk to ho siddiq khan and mansoor vali in ward 08 maihar
Read moreConstruction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Construction of drain and covering from badeveer neta house to river side, chhattar to khimma jatav, jamman panda to kishan jatav, dhanraj to gendalal, jagdish panda to kallu vanshkar in mata ward, nagar palika parishad, gadarwara
Read moreConstruction of road and drain from santosh kahar to lakhmichand jain in bhagat singh ward, nagar palika parishad, gadarwara
Construction of road and drain from santosh kahar to lakhmichand jain in bhagat singh ward, nagar palika parishad, gadarwara
Read moreof your Industry type