Tender Details

Particulars Details
Title
Civil Works In Existing Power House At Imphal International Airport
Description
Civil Works In Existing Power House At Imphal International Airport
Organisation Airports Authority of India | Public Sector Undertakings
Tender Id 2024_AAI_219340_1
Reference
Number
AAI/IMP/CIVIL/POWER HOUSE/2024
Tender Fee 1180
EMD 4.33 Lakh
Tender Value -
Place Imphal
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=244104

Start Date December 16, 2024 23:30
End Date
Expired 13/01/2025

Expired 621 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house

Design, manufacture, inspection, supply, transportation to site, supervision on erection, testing and commissioning of 1no. reciprocating air compressor with 55kg/cm2 discharge pressure and 7m3/min. inlet flowrate capacity along with suitable motor, control panel, sensors, indicators, electrical cables, plc controls etc at nagarjunasagar main power house

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Provision of turnpad centerline light at imphal international airport

Provision of turnpad centerline light at imphal international airport

Read more
Construction of operational boundary wall at imphal international airport

Construction of operational boundary wall at imphal international airport

Read more
Staff canteen facility license inside admin block (ats complex) at imphal international airport, imphal

Staff canteen facility license inside admin block (ats complex) at imphal international airport, imphal

Read more
License for operation of udan yatri cafe at imphal international airport

License for operation of udan yatri cafe at imphal international airport

Read more
Replacement of feeder cable for simple approach at imphal international airport

Replacement of feeder cable for simple approach at imphal international airport

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise