Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Jungle/Wild Growth Clearing In Various Area In Hee
|
| Description |
1)clearing Wild Growth By Cuttin Qty: 80000 Sm
2)earth Work Qty: 150 10
8) Qty:
|
| Organisation | Bharat Heavy Electricals Limited | Public Sector Undertakings |
| Tender Id | HEEP-W-202401991 |
|
Reference Number |
HEEP-W-202401991 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Haridwar |
| Link |
View Original Tender Notice
http://www.bhelhwr.co.in |
| Start Date | September 21, 2024 20:30 |
| End Date |
Expired
01/10/2024
Expired 722 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Emergent repairs to damaged lining at isolated patches, jungle clearance, cutting and removal of bushes,levelling of inspection path on distributary d 19 and its minors of kakatiya main canal in nizamabad district
Emergent repairs to damaged lining at isolated patches, jungle clearance, cutting and removal of bushes,levelling of inspection path on distributary d 19 and its minors of kakatiya main canal in nizamabad district
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreJungle/wild growth clearing in various area in hee
1)clearing wild growth by cuttin qty: 130000 sm 2)earth work qty: 300 10 8) qty:
Read moreMisc. jungle/wild growth clearing in various area in heep.
Misc. jungle/wild growth clearing in various area in heep.
Read moreMisc. jungle/wild growth clearing in various area in heep
Misc. jungle/wild growth clearing in various area in heep
Read moreCutting and clearing of wild growth
Cutting and clearing of wild growth and small trees inside the compound of sw transmitter, bheemapally, thiruvananthapuram
Read moreCutting and clearing of wild growth
Cutting and clearing of wild growth, tree branches and any fallen wood branches inside the compound of 20 kw mw transmitting station, kulathur, thiruvananthapuram
Read moreClearing wild growth by cutting plants/vegetation, bushes etc. in factory area cffp.
Clearing wild growth by cutting plants/vegetation, bushes etc. in 
 factory area cffp.
Read moreClearing jungle growth without felling trees
Nellippoyil kodeeri beat clearing jungle growth without felling trees
Read moreCleaning of jungle and horticulture/wild growth in bhel township, haridwar
Cleaning of jungle and horticulture/wild growth in bhel township, haridwar
Read moreof your Industry type