Tender Details
Particulars | Details |
---|---|
Title |
Installation Of 1 No Clustered (5) Ldtw (Solar) At Dhitora Mouza
|
Description |
Installation Of 1 No Clustered (5) Ldtw (Solar)with 150 Mm Dia G.I. Casting Pipe, 80 Mm Dia G.I. Blank Pipe And 75 Mm Stainless Steel Strainer Of 30 Ha Cca (Depth Of Tube Well 100 M) At Dhitora Mouza, Jl No. 40, Plot Nos. 3748, 5723, 5344, 2547,
|
Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
Tender Id | 2025_WRDD_834152_1 |
Reference Number |
WRDD/BDNAID/01/2025-26/Gr.G of E.E AI BURDWAN |
Tender Fee | 0 |
EMD | 74500 |
Tender Value | |
Place | Birbhum |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1858742 |
Start Date | April 08, 2025 23:30 |
End Date |
24/04/2025 ( Expired 17 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreChartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Chartering of green tug (green tug transition programme compliant) - manning, operation, maintenance and complete technical management of service provider owned01 no. 60t bollard pull new battery electric tug for 15 years at paradip port authority
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreSupply installation commissioning of high resolution manometry system solid state at aiims bhubaneswar
Supply installation commissioning of high resolution manometry system solid state at aiims bhubaneswar
Read moreSurface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Surface cleaning and painting work of tower structures of total 02 no 132kv ehv lines (total 617 nos. towers and weight of towers 2105.97mt) under eht-maint. dn satna on labour contract basis at the risk and cost of m/s. shri vardhman trade, jabalpu
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreSupply and installation commissioning of semi automatic punch instrument for iem screening at aiims bhubaneswar
Supply and installation commissioning of semi automatic punch instrument for iem screening at aiims bhubaneswar
Read moreSupply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Supply, installation, testing and commissioning of air conditioning and ventilation of rup plant exhaust system at frfcf, kalpakkam
Read moreConstruction of engineering hall-1 (back-end facility for lwr - llwmp)
Construction of engineering hall-1 (back-end facility for lwr - llwmp) and other miscellaneous works at barc, visakhapatnam, a.p.
Read moreof your Industry type