Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🏗️ Invitation For Bids: Construction Of Vup On Nh62 🛣️ The Ministry Of Road Transport And Highways, Central Government, Invites Bids From Reputable Contractors For The Epc (Engineering, Procurement, And Construction) Of A Vehicular Underpass (Vup) On National Highway 62 (Nh62) At Km 4+915, At The End Of Rohat Bypass On The Jodhpur Pali Section In The State Of Rajasthan. 📅 Bid Submission Deadline: May 06, 2024, 11:00 Am Tender Fee: Inr 10,000 Earnest Money Deposit (Emd): Inr 46,13,000 Interested Bidders Must Possess The Requisite Experience And Qualifications In Road Infrastructure Projects. Detailed Bids, Including Technical Specifications, Cost Estimates, And Project Timelines, Are To Be Submitted In Accordance With The Tender Documents. Keywords: Construction, Vehicular Underpass, Nh62, Epc Mode, Ministry Of Road Transport And Highways, Government Tender, Rajasthan, Infrastructure Project| Particulars | Details |
|---|---|
| Title |
Construction Of Vup On Nh62 At Km 4 915 End Of Rohat Bypass On Jodhpur Pali Section In The State Of Rajasthan On Epc Mode
|
| Description |
Construction Of Vup On Nh62 At Km 4 915 End Of Rohat Bypass On Jodhpur Pali Section In The State Of Rajasthan On Epc Mode
|
| Organisation | Ministry of Road Transport and Highways | Central Govt. Ministry/Department |
| Tender Id | 2024_MoRTH_799937_1 |
|
Reference Number |
SE PWD NH JODHPUR NIT NO 07/2023-24 |
| Tender Fee | 10000 |
| EMD | 46.13 Lakh |
| Tender Value | - |
| Place | PALI |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=840856 |
| Start Date | March 11, 2024 22:00 |
| End Date |
Expired
06/05/2024
Expired 845 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Construction of 4-lane elevated road near aiims darbhanga on shoban-ekmi bypass (length-2.320 km) & construction of elevated road from lohjiya chowk to pandasarai rob with ramp towards pandasarai from lohiya chowk (length-2.142 km) in darbhanga district in the state of bihar on epc mode
Read moreDesign, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Design, build, construct, install, and commissioning of material recovery facility (mrf) plant of 25 tpd for dry waste along with operation and maintenance of the plant for 5 years on epc mode.
Read moreConstruction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Construction of rob at ch-26th km of sobhan chowk (nh-27) to agropatti chowk makia (sh-52) road project (announced during pragati yatra) under district of darbhanga, bihar on epc mode
Read moreOnstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Onstruction of new 2-lane h.l. rcc bridge over river falgu including 4-lane trumpet in approach road in between kothwara bazar (nh-99, dobhi-chatra road) to integrated manufacturing cluster (imc) land acquire area near gamhariya samudayik bhawan and also rehabilitation of old existing 2-lane kothwara (bariya) bridge parallel to proposed alignment in district gaya, state-bihar on epc mode
Read moreConstruction of vup near marwar industrial cluster on nh 62 jodhpur pali section from km 300.000 to 342.550 in the state of rajasthan on epc mode
Construction of vup near marwar industrial cluster on nh 62 jodhpur pali section from km 300.000 to 342.550 in the state of rajasthan on epc mode
Read moreConstruction of vup at km 172.000 at the of beed bypass on yedshi aurangabad section of nh-52 in the state of maharashtra on epc mode.
Construction of vup at km 172.000 at the of beed bypass on yedshi aurangabad section of nh-52 in the state of maharashtra on epc mode.
Read moreConstruction of vup at km 184.240 at the end of beed bypass on yedshi aurangabad section of nh-52 in the state of maharashtra on epc mode.
Construction of vup at km 184.240 at the end of beed bypass on yedshi aurangabad section of nh-52 in the state of maharashtra on epc mode.
Read moreConstruction of vup at km 220520 and vup at km 292150 on agraetawah section of nh19 in the state of uttar pradesh on epc mode
Construction of vup at km 220520 and vup at km 292150 on agra etawah section of nh19 in the state of uttar pradesh on epc mode
Read moreConstruction of 6-lane vup at km. 207.615 (ing point of milak bypass) on nh-530, in district rampur in the state of uttar pradesh on epc mode
Construction of 6-lane vup at km. 207.615 (ing point of milak bypass) on nh-530, in district rampur in the state of uttar pradesh on epc mode
Read moreConstruction of dharmagarh bypass on nh-130c in the state of odisha on epc mode
Construction of dharmagarh bypass on nh-130c in the state of odisha on epc mode
Read moreof your Industry type