Tender Details
Particulars | Details |
---|---|
Title |
Handling, Laying And Joining By Welding Of Departmental Gi Prefabricated, Medium Class Gi Rising Mains From Stage 1st To Pst And From Clear Water Sump To 02 Nos. Oh Ts Of Wss Shilwat Under Jjm
|
Description |
Handling, Laying And Joining By Welding Of Departmental Gi Prefabricated, Medium Class Gi Rising Mains From Stage 1st To Pst And From Clear Water Sump To 02 Nos. Oh Ts Of Wss Shilwat Under Jjm
|
Organisation | Government of Jammu and Kashmir |
Tender Id | 2023_PHE_225896_8 |
Reference Number |
PHE/MDNS/NIT/JJM/E-26 of 2023-24 |
Tender Fee | 500 |
EMD | 0 |
Tender Value | |
Place | Exe Eng Jal Shakti (PHE) Mech Div North Sopore |
Link | https://jktenders.gov.in |
Start Date | August 11, 2023 15:30 |
End Date |
21/08/2023 ( Expired 609 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump of pokhribal stage 1st.
Design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump of pokhribal stage 1st.
Read moreDesign, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump of pokhribal stage 1st.
Design, engineering, providing, welding, laying/fixing in proper position, testing and commissioning of 630mm diameter hdpe raw water intake pipeline in nigeen lake from ashai bagh bridge up to the sump of pokhribal stage 1st.
Read moreLaying and fitting of 80mm diameter departmental gi pipe at the damaged portion of rising main laid from zethyar 1st to zeshta devi temple
Laying and fitting of 80mm diameter departmental gi pipe at the damaged portion of rising main laid from zethyar 1st to zeshta devi temple
Read moreHandling, laying and joining by welding of departmental gi/ms prefabricated, medium class gi rising main from clear water sump to 01 no. existing oht of wss tarzoo under jjm
Handling, laying and joining by welding of departmental gi/ms prefabricated, medium class gi rising main from clear water sump to 01 no. existing oht of wss tarzoo under jjm
Read moreHandling, laying and joining by welding of departmental gi prefabricated 150mm diameter medium class gi rising mains from stage 1st to pst and from clear water sump to oht at wss baniyari shirki under ut capex (earlier jkidfc)
Handling, laying and joining by welding of departmental gi prefabricated 150mm diameter medium class gi rising mains from stage 1st to pst and from clear water sump to oht at wss baniyari shirki under ut capex (earlier jkidfc)
Read moreA/r and m/o medium lift irrigation project to changer area from anandpur hydel channel in tehsil sh. naina devi ji district bilaspur (sh providing butt welding of rising mains gravity main at various rds under 6 nos zones 1a 1b 1c 1d 2a 2b including
A/r and m/o medium lift irrigation project to changer area from anandpur hydel channel in tehsil sh. naina devi ji district bilaspur (sh providing butt welding of rising mains gravity main at various rds under 6 nos zones 1a 1b 1c 1d 2a 2b including
Read moreKmc/ws/ee/s/095/2024-25/02/1st call
Improvement of filtered water supply by laying 150 mm dia m.s. pipe from samajgarh shitala khola b.p.s. to 1 nos arabinda nagar club in ward no. 95, under br.-x.
Read moreProviding, laying, joining by welding of 200mm nd ms pipe from stage 1st to pst of wss nowgam gund payeen under jjm
Providing, laying, joining by welding of 200mm nd ms pipe from stage 1st to pst of wss nowgam gund payeen under jjm
Read moreHandling, laying and joining by push-on jointing of departmental ductile iron rising mains from stage 1st to pst at wss nowgam gund payeen under jjm
Handling, laying and joining by push-on jointing of departmental ductile iron rising mains from stage 1st to pst at wss nowgam gund payeen under jjm
Read moreHandling, laying and joining by welding of departmental gi/ms prefabricated, medium class gi rising mains from stage 1st to wss sidiq colony and model town under ut capex
Handling, laying and joining by welding of departmental gi/ms prefabricated, medium class gi rising mains from stage 1st to wss sidiq colony and model town under ut capex
Read moreof your Industry type