Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Execution Of P.Way Works Such As 1.Trr(p) 15.080 T Kms, 2.Tbr 15.339 Kms 3.Tfr 28.897 Tkms Under The Jurisdiction Of Aden/Mngd In Sambalpur Division.
|
| Description |
Execution Of P.Way Works Such As 1.Trr(p) 15.080 T Kms, 2.Tbr 15.339 Kms 3.Tfr 28.897 Tkms Under The Jurisdiction Of Aden/Mngd In Sambalpur Division.
|
| Organisation | Ministry of Railways |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link | Login to view |
| Start Date | October 17, 2026 01:24 |
| End Date |
Open
09/11/2026
22 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Execution of p.way works such as 1.trr(p)- 8.003 tkms 2.tbr- 8.340 kms 3.tfr- 55.475 tkms under the jurisdiction of aden/tig in sambalpur division.
Execution of p.way works such as 1.trr(p)- 8.003 tkms 2.tbr- 8.340 kms 3.tfr- 55.475 tkms under the jurisdiction of aden/tig in sambalpur division.
Read moreMakholi-mathura section - trr(p) - 4.307 kms with 60kg rails, ttr(fs) - 06 sets, tfr - 11.604 kms and tfr(r) - 1.934 kms.
Makholi-mathura section - trr(p) - 4.307 kms with 60kg rails, ttr(fs) - 06 sets, tfr - 11.604 kms and tfr(r) - 1.934 kms.
Read more(1) tbr (up, dn & iiird line) under aden/tmr. (2) tfr - 11.678 kms with erc mark (3) trr (p) - 10.711 tkm. (4) ttr (fs+tws+wcmsc) - 11 sets on kt-kwn section (5) tbr - 6.969 kms of passenger & non- passenger running loop lines of a routed under the jurisdiction of aden/tmr. (6) kt-kwn-ttr (tws+wcmsc) - 40 sets, ttr (cs+cmsc)-3 sets & ds - 25 sets from 52 kg to 60 kg. (7) trr(p)-7.148 km on passenger running loop lines of a routes under the jurisdiction of aden/tmr. (8) trr(s)-3.97
(1) tbr (up, dn & iiird line) under aden/tmr. (2) tfr - 11.678 kms with erc mark (3) trr (p) - 10.711 tkm. (4) ttr (fs+tws+wcmsc) - 11 sets on kt-kwn section (5) tbr - 6.969 kms of passenger & non- passenger running loop lines of a routed under the jurisdiction of aden/tmr. (6) kt-kwn-ttr (tws+wcmsc) - 40 sets, ttr (cs+cmsc)-3 sets & ds - 25 sets from 52 kg to 60 kg. (7) trr(p)-7.148 km on passenger running loop lines of a routes under the jurisdiction of aden/tmr. (8) trr(s)-3.97
Read moreVirar - joravasan (i) trr(p)-9.35km. (ii) tfr-64.705 tkm, renewal of mk-iii erc-23116 nos. & tbr (p&c)-25sets. (iii) track work in connection of extension of existing platform no. 4/5 upto 600m at dahanu road.
Virar - joravasan (i) trr(p)-9.35km. (ii) tfr-64.705 tkm, renewal of mk-iii erc-23116 nos. & tbr (p&c)-25sets. (iii) track work in connection of extension of existing platform no. 4/5 upto 600m at dahanu road.
Read more(1)tbr under aden / track/nagpur, (2)ttr (fs+tws+wcmsc) 21 sets & ttr (ds) - 13 sets. (3)renewal of ordinary / improved sej into twsej with psc sleepers (planned basis) 14sets and glued joint 54 sets. (4) tfr under aden/track/nagpur (5) trr (p) under aden/track/nagpur.
(1)tbr under aden / track/nagpur, (2)ttr (fs+tws+wcmsc) 21 sets & ttr (ds) - 13 sets. (3)renewal of ordinary / improved sej into twsej with psc sleepers (planned basis) 14sets and glued joint 54 sets. (4) tfr under aden/track/nagpur (5) trr (p) under aden/track/nagpur.
Read more(a)nagpur division casual renewal of cs, cms, tws, ds & ttr(tfr),(b)nagpur division-casual renewal of rails=3.33kms & casual renewal of sleeper=3.33 kms.(c)nagpur division-replacement of overaged sej by twsej-42 sets.(d)ttr(fs+tws+wcmsc)=14nos (1 in 8.5=9nos, 1 in 12=5nos) g.total=14 nos in branch lines of ngp division.(e)proposed tbr from (a)-1)kms 811.00-818.00=7.00kms-sl,2)kms 840.786-841.000=0.214 kms-sl, total=7.214 kms in butibori-umred section,(b)-1)kms 1041.00-1041.600=0.600kms
(a)nagpur division casual renewal of cs, cms, tws, ds & ttr(tfr),(b)nagpur division-casual renewal of rails=3.33kms & casual renewal of sleeper=3.33 kms.(c)nagpur division-replacement of overaged sej by twsej-42 sets.(d)ttr(fs+tws+wcmsc)=14nos (1 in 8.5=9nos, 1 in 12=5nos) g.total=14 nos in branch lines of ngp division.(e)proposed tbr from (a)-1)kms 811.00-818.00=7.00kms-sl,2)kms 840.786-841.000=0.214 kms-sl, total=7.214 kms in butibori-umred section,(b)-1)kms 1041.00-1041.600=0.600kms
Read moreA)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
A)schedule for karjat yard improvement. (project id 01.02.31.25.3.10.046) (cp 415) b)karjat-lonavala:- tsr(p) - 12.930 tkm and ctr(p) -1.840 tkm.(project id 01.02.31.26.3.51.011) c)kalyan lonavala - tbr- 3.50 tkm, tfr 24.903 tkm and tfr(r) - 7.197 tkm ( project id 01.02.31.26.3.51.029 d)kalyan lonavala - casual renewal of sleepers - 6.900 tkm and casual renewal of rails - 1.675 tkm.(project id 0102.31.26.3.51.002) e)karjat lonavala- trr(p)- 17.320 tkm and ctr(p) - 0.500 tkm.( project id 01.02.
Read moreVarious track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)
Various track works such as trr(p) = 5.517 tkm, ttr(tsr) = 37 sets (1 in 12 -36 sets & 1 in 8.5 -1 set) , ttr (fs+tws+wcmsc)= 2 sets (1 in 12) , ttr(wcmsc) = 1 set (1 in 12) & tbr(manual) = 9.866 tkm in the jurisdiction of sr. den- v/lko. (estt. no. 135-2025, 175-2026, 170-2026, 164-2026 & 176-2026)
Read more(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
(a)proposed extension(150 m) of ngp end shunting neck to convert track machine siding at pulgaon yard(csr=280 m)under sse(p.way)pulgaon section under aden wardha sub-division.(b)ngp division casual renewal of cs,cmsc,tws,ds & ttr(tfr).(c)ngp division-casual renewal of rails=3.34 kms & casual renewal of sleepers=3.34 kms.(d)nagpur division-replacement of overaged sej by twsej-41 sets. (e)ttr(fs+tws+wcmsc)=8nos(1 in 8.5=5nos,1 in 12=3nos)g.total=8 nos in branch line of ngp division.(f)pr
Read more1) solapur division- various types of track works under the yard improvement umbrella at shendri, barshi town, pajari, dharashiv, yedshi, dhoky, ausa road, harangul, latur, modlimb, pandharpur, sangola, jath road, dhalgaon, kavathe mahankal, salgare & arag yard. 2)yard imp works like trr, tfr, tbr and ttr (tws) in pr lines for brb, jeur, ppj, prwd, wka along with lur, hgl, osa and bot yard.3) twr work in kwv-sei 13.2 km under aden/lur sub-division in sur division. 4) execution of fb weldin
1) solapur division- various types of track works under the yard improvement umbrella at shendri, barshi town, pajari, dharashiv, yedshi, dhoky, ausa road, harangul, latur, modlimb, pandharpur, sangola, jath road, dhalgaon, kavathe mahankal, salgare & arag yard. 2)yard imp works like trr, tfr, tbr and ttr (tws) in pr lines for brb, jeur, ppj, prwd, wka along with lur, hgl, osa and bot yard.3) twr work in kwv-sei 13.2 km under aden/lur sub-division in sur division. 4) execution of fb weldin
Read moreof your Industry type