Tender Details

Particulars Details
Title
Rate Contract For Augmentation Of 25 Kva To 63 Kva, 63 Kva To 100 Kva, 100 Kva To 250 Kva, 250 Kva To 400 Kva, 400 Kva To 630 Kva Sub Stations Under Electric Division I, Parade, Jammu For The Financial Year 2025 26 (Labour Only).
Description
Rate Contract For Augmentation Of 25 Kva To 63 Kva, 63 Kva To 100 Kva, 100 Kva To 250 Kva, 250 Kva To 400 Kva, 400 Kva To 630 Kva Sub Stations Under Electric Division I, Parade, Jammu For The Financial Year 2025 26 (Labour Only).
Organisation DC-PDD | State Govt. and UT
Tender Id 2025_PDD_274577_1
Reference
Number
ED-I/e-NIT/19 of 2025-26 Dated 19/03/2025
Tender Fee 1000
EMD 10000
Tender Value
Place Parade Jammu
Link https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=847004
Start Date March 19, 2025 20:30
End Date

11/04/2025 ( Expired 60 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders

Patch repairing work from chainage 2.00 kmp to 5.00 kmp and 12.00 km to 15.00 km in stretches of nalhati rajgram road under rampurhat highway sub-division of birbhum highway division-i in the district of birbhum during the year 2025-26

Read more
Annual rate contract for carrying out day to day routine maintenance restoration works related to 33 11kv receiving stations and 33kv lines under the jurisdiction sub-transmission division (jpdcl) kalakote

Annual rate contract for carrying out day to day routine maintenance restoration works related to 33 11kv receiving stations and 33kv lines under the jurisdiction sub-transmission division (jpdcl) kalakote

Read more
Rate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iiijammu during the fin yr 2025-26 or till next tender is finalized.

Rate contract for creation of 25 kva 63 kva 100 kva 250 kva 3-phase distribution transformer on turnkey basis at different locations along with ht/lt in electric division-iii jammu during the fin yr 2025-26 or till next tender is finalized.

Read more
Annual rate contract for supply of transformer oil to electrical workshop division kupwara for the year 2025-26 or till finalization of next contract.

Annual rate contract for supply of transformer oil to electrical workshop division kupwara for the year 2025-26 or till finalization of next contract.

Read more
Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr pcc poles under the ed-i parade, jammu for fy 2025-26 labour only.

Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr pcc poles under the ed-i parade, jammu for fy 2025-26 labour only.

Read more
Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr st poles under the ed-i parade, jammu for fy 2025-26 labour only.

Rate contract for erection, testing and commissioning for laying of 1 km ht xlpe cable 50 sqmm, 70 sqmm, 95 sqmm, 120 sqmm and 300 sqmm 3 core on 8/9mtr st poles under the ed-i parade, jammu for fy 2025-26 labour only.

Read more

Patch repairing work from 12.00 km to 22.35 km in stretches (excluding mastic zone 22.224 km to 22.230 km) of bahina more to andi road via kamraghat under mollarpur highway sub division of birbhum highway division-i during the year 25-26

Read more
Carrying out patrolling routine breakdown maintenance of 220kv dumka rupnarayanpur d c transmission line under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months

Carrying out patrolling routine breakdown maintenance of 220kv dumka rupnarayanpur d c transmission line under transmission sub division madanpur for the f y 2025 26 i e from 01 07 2025 to 31 03 2026 i e 09 months

Read more
Carrying out patrolling routine breakdown shutdown maintenance of 132 kv d c madanpur dumka pakur transmission lines from loc 01 to 295 approx 84 5 km under transmission sub division pakur for f y 2025 26 i e 01 07 2025 to 31 03 2026

Carrying out patrolling routine breakdown shutdown maintenance of 132 kv d c madanpur dumka pakur transmission lines from loc 01 to 295 approx 84 5 km under transmission sub division pakur for f y 2025 26 i e 01 07 2025 to 31 03 2026

Read more
Carrying out patrolling routine breakdown maintenance of 132kv dumka lalmatia total nos of tower 322 57 lilo tower transmission line under transmission sub division dumka for the f y 2025 26 i e from 01 07 2025 to 31 03 2026

Carrying out patrolling routine breakdown maintenance of 132kv dumka lalmatia total nos of tower 322 57 lilo tower transmission line under transmission sub division dumka for the f y 2025 26 i e from 01 07 2025 to 31 03 2026

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise