Tender Details
Particulars | Details |
---|---|
Title |
Wiring And Power Supply Arrangement In Two Shelter Kept At Checkpost 11 At Golitand And The New Checkpost Room Built Between The Middle Portion Of Black Top Road Masilaung For Installation Of The Rfid System With Installation Of Two Number Hexagonal
|
Description |
Wiring And Power Supply Arrangement In Two Shelter Kept At Checkpost 11 At Golitand And The New Checkpost Room Built Between The Middle Portion Of Black Top Road Masilaung For Installation Of The Rfid System With Installation Of Two Number Hexagonal
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_331091_1 |
Reference Number |
GM(MS)/SO(EnM)/e-NIT/24-25/89 |
Tender Fee | 0 |
EMD | 5110 |
Tender Value | |
Place | Office Of the Project Officer Magadh OCP, M-S Area |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343169 |
Start Date | March 04, 2025 16:30 |
End Date |
13/03/2025 ( Expired 40 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Provision of wall tiles in mi room /opd complex, installation of beading on wall tiles and false ceiling at certain places in inhs kalyani, provision of two storage sheds at blo(v) office and to roof top to cover the opening to arrest rainfall
Provision of wall tiles in mi room /opd complex,
 installation of beading on wall tiles and false ceiling
 at certain places in inhs kalyani, provision of two
 storage sheds at blo(v) office and to roof top to cover
 the opening to arrest rainfall
Read moreSupply and installation of audio visual system at 4th floor conference room, new technical building, sgtpp, wbpdcl.
Supply and installation of audio visual system at 4th floor conference room, new technical building, sgtpp, wbpdcl.
Read moreSupply, installation, testing and commissioning of total 50 kwp 20 20 10 grid connected roof top solar pv system at two locations in cantonment board jutogh
Supply, installation, testing and commissioning of total 50 kwp (20 20 10) grid connected roof top solar pv system at two locations in cantonment board jutogh
Read moreSupply, installation, testing and commissioning of total 228 kw grid connected solar pv power plant with roof-top net metering, 03 nos. of 10 hp dc and 04 nos. of 7.5 hp dc solar water pumping system at 11 various places of gadchiroli district
Supply, installation, testing and commissioning of total 228 kw grid connected solar pv power plant with roof-top net metering, 03 nos. of 10 hp dc and 04 nos. of 7.5 hp dc solar water pumping system at 11 various places of gadchiroli district
Read moreProvision of sub-main wiring for installation ups input/output connection along with power plug point in the various location in the sart building and installation of 40kva ups along with suitable distribution system at entire old block of hss dept.
Provision of sub-main wiring for installation ups input/output connection along with power plug point in the various location in the sart building and installation of 40kva ups along with suitable distribution system at entire old block of hss dept.
Read moreWiring of newly constructed portable road weighbridge room and installation of lightning arrester with sky net at newly shifted portable road weighbridge at kuju new siding of topa project under kuju area.
Wiring of newly constructed portable road weighbridge room and installation of lightning arrester with sky net at newly shifted portable road weighbridge at kuju new siding of topa project under kuju area.
Read moreModernization of plumb-line system by supply and installation of automatic plumb line system one at el at 1212 m and two at el 1250 m (xy coordinator readout charge coupled device and automatic data transmission to dam control room) at dul dam, dulh
Modernization of plumb-line system by supply and installation of automatic plumb line system one at el at 1212 m and two at el 1250 m (xy coordinator readout charge coupled device and automatic data transmission to dam control room) at dul dam, dulh
Read moreArrangement of lighting arrester, new earth pits construction and connection by cu wire etc. for protection of electrical equipment and wiring of 02 newly constructed room at banwar substation of topa ocp under kuju area.
Arrangement of lighting arrester, new earth pits construction and connection by cu wire etc. for protection of electrical equipment and wiring of 02 newly constructed room at banwar substation of topa ocp under kuju area.
Read moreElectrical wiring of the building of the water supply department at sangli telephone center, obtaining new connections from the m.r.v.v. company, installation of external lighting system, network system, cctv cameras and inverter batteries
Electrical wiring of the building of the water supply department at sangli telephone center, obtaining new connections from the m.r.v.v. company, installation of external lighting system, network system, cctv cameras and inverter batteries
Read moreElectrical new wiring job (inner and outer)side of 02 nos.new room near diesel pump at akwmc and elecrical wiring repairing - 02 no room(for two booth) middle school - 02 no room(for two booth)
Electrical new 
 wiring job (inner 
 and outer)side 
 of 02 nos.new 
 room 
 near 
 diesel pump at 
 akwmc 
 and 
 elecrical wiring 
 repairing - 02 no 
 room(for two 
 booth) middle 
 school - 02 no 
 room(for two 
 booth)
Read moreof your Industry type