Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 500 Capacity Mph At Balijhara Santosinagar In Ward No 5 And Costn Of 300 Capacity Mph At Backside Of Jagannath Truck Association In Ward No 2 In The Dist Of Jspur For The Year 2023 24
|
Description |
Building Works
|
Organisation | Government of Odisha |
Tender Id | 2023_CERWI_92406_4 |
Reference Number |
Tender Online RWC 14-23 |
Tender Fee | 10000 |
EMD | 4.69 Lakh |
Tender Value | |
Place | CCE RW Circle Cuttack |
Link | https://tendersodisha.gov.in |
Start Date | August 16, 2023 23:30 |
End Date |
31/08/2023 ( Expired 630 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 72 tenements ground and 2 storied at old fish market colony in t.s.no.640 of kumbakonam town, block no 6, ward no.5, thanjavur district
Construction of 72 tenements ground and 2 storied at old fish market colony in t.s.no.640 of kumbakonam town, block no 6, ward no.5, thanjavur district
Read moreConstruction of rcc elevated over head reservoir intze type of capacity 450 cum with pile foundation at ward no. 9 zone-5 within islampur municipality under amrut 2.0
Construction of rcc elevated over head reservoir intze type of capacity 450 cum with pile foundation at ward no. 9 zone-5 within islampur municipality under amrut 2.0
Read moreConstruction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)
Construction / strengthening work of mrf / composting plant at the trenching ground in ward no 5. under swachh bharat mission 2.0 (urban)
Read moreConstruction of cc road and u shape drain at ward no. 5 in indra colony
Construction of cc road and u shape drain at ward no. 5 in indra colony
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc fgc group no-2
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc fgc group no-2
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc dng group no-2
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc dng group no-2
Read moreSpecial repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc dbn group no-2
Special repair of link roads under special repair programme year 2022-23 2023-24 and 2024-25 from earth work upto premix carpet including constn. of culverts,ret.walls and road furniture safety measures with 5 year maintenance mc dbn group no-2
Read moreSupply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Supply, erection, testing, commissioning for 5 x 250 kva sub-stations alongwith lt extension, erection of 5 no isolation point and laying of ht xlpe cable 120 mm sq on 9m st pole at smgs hospital for ac system in ward no 1, 2, 3, 16 , 20 under ed-
Read moreConsultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak
Consultancy services for appointment of authority engineer for supervision of construction of 2 lane 386 mtr long extradosed bridge over river siang at design km 2 pt 908 and 63 pt 5 mtr long major bridge at design km 2 pt 590 in project brahmnak
Read moreConstruction of pcc road and rcc cover slab beside house of tapan ghosh at dwarika prasad lane and p.c.c platform at backside of sisti jaladhar at baluchar (n) in ward no 09, plumbing work and painting with supply of water tank with iron gate
Construction of pcc road and rcc cover slab beside house of tapan ghosh at dwarika prasad lane and p.c.c platform at backside of sisti jaladhar at baluchar (n) in ward no 09, plumbing work and painting with supply of water tank with iron gate
Read moreof your Industry type