Tender Details
Particulars | Details |
---|---|
Title |
Sweeping Cleaning Work To T/C Building Known As 1 A, 1 B, 1 C, 2 A, 2 B, 3 A, 3 B, 3 C, 3 D, 3 E At Gavanpada, Mulund (E), Mumbai In E 2 Ward (Period 01/01/2025 To 31/12/2025)
|
Description |
Sweeping Cleaning Work To T/C Building Known As 1 A, 1 B, 1 C, 2 A, 2 B, 3 A, 3 B, 3 C, 3 D, 3 E At Gavanpada, Mulund (E), Mumbai In E 2 Ward (Period 01/01/2025 To 31/12/2025)
|
Organisation | Maharashtra Housing and Area Development Authority | State Govt. and UT |
Tender Id | 2024_MHADA_1084258_1 |
Reference Number |
EE/E-2/e-Tender/DDR/17/2024-25 |
Tender Fee | 1090 |
EMD | 0 |
Tender Value | |
Place | EE/E-2/MBRRB |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1892358 |
Start Date | September 13, 2024 15:35 |
End Date |
20/09/2024 ( Expired 262 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Carrying routine patrolling prive breakdown maintenance of 132kv d c pakur rajmahal transmission line from loc no 01 to 267 64km under jurisdiction of transmission sub division rajmahal for the period from 01 07 2025 to 31 03 2026 i e
Carrying routine patrolling prive breakdown maintenance of 132kv d c pakur rajmahal transmission line from loc no 01 to 267 64km under jurisdiction of transmission sub division rajmahal for the period from 01 07 2025 to 31 03 2026 i e
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreSweeping cleaning work to r/c bldg known as asharfi manzil a and b wing,islamia manzil a and b wing,ideal apartment, aqsa manzil a, b, c, d wing, navbahar, khoza chawl (nasemon manzil), mombatti chawl, under e-2 ward. period-01/08/2025 to 31/07/2026.
Sweeping cleaning work to r/c bldg known as asharfi manzil a and b wing, islamia manzil a and b wing, ideal apartment,aqsa manzil a,b,c,d wing,navbahar,khoza chawl(nasemon manzil),mombatti chawl,under e-2 ward.period-01/08/2025 to 31/07/2026.
Read moreSupply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Supply, installation and commissioning of water spray system at conveyor belt 1a, 1b, 1c, 1d, 2a1, 2b1, 2a, 2b, 2c, 2d, 3a, 3b, 3c and 3d at ktps under capex 24-25
Read moreSweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e., from 01-04-2025 to 31-03-2026. (with iala funds)
Sweeping of all the roads, cleaning of storm water drains, lifting and transportation of garbage (to the recognized dumping yard near textile park madikonda) of industrial park warangal and kakatiya autonagar warangal for a period of twelve months i.e. from 01-04-2025 to 31-03-2026. (with iala funds)
Read moreItem no 1a,item no 1b,item no 2a,item no 2b,item no 3a,item no 3b,item no 3c,item no 3d,item no 3e,
Read more
Sweeping and cleaning work at reconstructed bldg known as saikrupa, siddhant, suryadarshan, prabhanjan in f/s ward.(group v) (period 01/04/2025 to 31/03/2026)
Sweeping and cleaning work at reconstructed bldg known as saikrupa, siddhant, suryadarshan, prabhanjan in f/s ward.(group v) (period 01/04/2025 to 31/03/2026)
Read moreKtps-v-i and c-engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 km per month for the conveyance of divisional engineer/ic division/ktps-v stage for the period of one year from 01-04-2025 (or from actual date of utilizaion) to 31-03-2026.(reserved for st category)
Ktps-v-i and c-engaging of jeep along with driver on hire basis for 12 hr per day for a mileage up to 2000 km per month for the conveyance of divisional engineer/i and c division/ktps-v stage for the period of one year from 01-04-2025 (or from actual date of utilizaion) to 31-03-2026.(reserved for st category)
Read moreSweeping and cleaning of t/c bldg no 3c and 3d new hind mill mazgaon ,mumbai. (period 01/04/2025 to 31/03/2026)
Sweeping and cleaning of t/c bldg no 3c and 3d new hind mill mazgaon ,mumbai. (period 01/04/2025 to 31/03/2026)
Read moreTtps es circle mrt ii day to day cleaning maintenance and testing assistance activities for control protection panels and allied field equipments services in turbine auxiliaries sub-division mrt ii for a period of 12 months from 01 04 2025 to 31
Ttps es circle mrt ii day to day cleaning maintenance and testing assistance activities for control protection panels and allied field equipments services in turbine auxiliaries sub-division mrt ii for a period of 12 months from 01 04 2025 to 31
Read moreof your Industry type