Tender Details
Particulars | Details |
---|---|
Title |
Construction Work Of Boundary Wall, Gate, Toilet Etc. Of Kasturba Gandhi Balika Vidyalaya, Chouparan, Block Chouparan, Dist. Hazaribag.
|
Description |
Construction Work Of Boundary Wall, Gate, Toilet Etc. Of Kasturba Gandhi Balika Vidyalaya, Chouparan, Block Chouparan, Dist. Hazaribag.
|
Organisation | WRD EinC Major-Med n Minor | State Govt. and UT |
Tender Id | 2025_WRD_100664_1 |
Reference Number |
DMFT/MID/HAZARIBAG/F2-01/2025 - 26 (Group No.-01) |
Tender Fee | 10000 |
EMD | 3.1 Lakh |
Tender Value | |
Place | CHOUPARAN, HAZARIBAG |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=135200 |
Start Date | April 28, 2025 23:25 |
End Date |
06/05/2025 ( Expired 5 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreWbphed/02/bwn of se/cc of 2025-2026 sl.no.4
Different works related sinking of additionaltube-wells interconnection fhtcs construction of pump house boundary wall protection works approach road etc. with 09 nos.pwss of manteswer block of durgapur sub divn under burdwan divn phe dte.&#x0d &#x0d &#x0d
Read moreConstruction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode
Read moreConstruction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Read moreRepair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Repair and maintenance of boundary wall from the main gate to market area and different places in dvc colony at tilaiya dam,t.k. division konar
Read moreConstruction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Construction of two nos of toilet blocks boys and girls in ghps school including electrification works in donimalai under csr work 2025-26
Read moreConstruction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Construction of new operational boundary wall in place of old, damaged load bearing boundary wall and raising of boundary wall as per bcas standard including provision of precast slab below ground level as required at mbb airport, agartala
Read moreConstruction of park boundary wall
Construction of park boundary wall near barahi mata mandir at ward 13
Read moreInstallation of view cutters on boundary wall from drop gate to terminal building at srinagar airport
Installation of view cutters on boundary wall from drop gate to terminal building at srinagar airport
Read moreConstruction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Construction of retaining wall work in design ch. 0.700, 2.800, 16.200, 14.200 and 18.400, on risk and cost basis of contractor under rehabilitation and upgradation of nh-66 (old nh 17) from km 161.600 to km 205.400 (kashedi to parshuram ghat sec
Read moreof your Industry type