Tender Details

Particulars Details
Title
Complete New Wiring Of Office Rooms (5 No.) At Goal 6 Siding Of Kocp
Description
Complete New Wiring Of Office Rooms (5 No.) At Goal 6 Siding Of Kocp
Organisation Coal India Limited (CIL)
Tender Id 2023_BCCL_286919_1
Reference
Number
BCCL/BA-IX/ENM/23-24/175 22/08/2023
Tender Fee -
EMD 600
Tender Value -
Place BASTACOLLA AREA ENM DEPARTMENT
Link
View Original Tender Notice

https://coalindiatenders.nic.in

Start Date August 25, 2023 14:30
End Date
Expired 08/09/2023

Expired 1131 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Ac complete wiring with fitting and repair with refilling gas of mpvy veh ba no 12r 009358a, 13r00935

Ac complete wiring with fitting and repair with refilling gas of mpvy veh ba no 12r 009358a, 13r00935

Read more
Rewiring of old and deteriorated electrical wiring in the rooms constructed for drivers, police/security staff, post office, toilets and other rooms located in the parking area in haryana vidhan sabha, sector-1, chandigarh (mtc. of e.i. in nrb at cha

Rewiring of old and deteriorated electrical wiring in the rooms constructed for drivers, police/security staff, post office, toilets and other rooms located in the parking area in haryana vidhan sabha, sector-1, chandigarh (mtc. of e.i. in nrb at cha

Read more
Repair/ maint of old unsv wiring, sub main wiring, dbs, led lights, lt cables, street lights, complete lighting system, acs/ summer appliances and comprehensive maint of dg set to include spare parts and other connected works of ghitorni location

Repair/ maint of old unsv wiring, sub main wiring, dbs, led lights, lt cables, street lights, complete lighting system, acs/ summer appliances and comprehensive maint of dg set to include spare parts and other connected works of ghitorni location

Read more
Upgradation of cooling tower and sitc of pic valves complete with actuator, thermostat and control wiring etc. of the central hvac system for better energy efficiency in r and d complex ------------jankipuram campus.

Upgradation of cooling tower and sitc of pic valves complete with actuator, thermostat and control wiring etc. of the central hvac system for better energy efficiency in r and d complex ------------jankipuram campus.

Read more
Rfid electronic hotel door lock complete with handle,rfid guest adsetting cards,rfid card encoder,lock management software for 210 rooms,rfid handheld device,rfid energy saving device,initial of batteries,rfid locks installation at site on wooden door

Rfid electronic hotel door lock complete with handle,rfid guest adsetting cards,rfid card encoder,lock management software for 210 rooms,rfid handheld device,rfid energy saving device,initial of batteries,rfid locks installation at site on wooden door

Read more
Rewiring of light fan exhaust fan call bell points with 1.5 sq.mm frls hffr copper cable including earth wire dismantling and laying through conduit complete as per dsr e and m 2025,wiring for light and power plug with 2x4 sq mm frls pvc insulated copper cable through pvc conduit with 4 sq mm frls pvc insulated copper cable for loop earthing complete as per dsr e and m 2025,wiring for circuit submain with earth wire frls pvc insulated copper conductor single core cable in surface recessed pvc conduit 2 x 2.5 sq. mm and 1 x 2.5 sq. mm earth wire as per dsr e and m 2025,supplying and fixing of 25mmx16mm cable trunking system casing capping with accessories in surface or recess including fitting on wall and making good the same as required,supply of 4x4 pvc junction box 1 and 2 and 3 ways.,supplying and fixing 2m box with frame and cover plate,supplying and fixing 3m box with frame and cover plate,supplying and fixing 4m box with frame and cover plate,supplying and fixing 6m box with frame and cover plate,supply

Rewiring of light fan exhaust fan call bell points with 1.5 sq.mm frls hffr copper cable including earth wire dismantling and laying through conduit complete as per dsr e and m 2025,wiring for light and power plug with 2x4 sq mm frls pvc insulated copper cable through pvc conduit with 4 sq mm frls pvc insulated copper cable for loop earthing complete as per dsr e and m 2025,wiring for circuit submain with earth wire frls pvc insulated copper conductor single core cable in surface recessed pvc conduit 2 x 2.5 sq. mm and 1 x 2.5 sq. mm earth wire as per dsr e and m 2025,supplying and fixing of 25mmx16mm cable trunking system casing capping with accessories in surface or recess including fitting on wall and making good the same as required,supply of 4x4 pvc junction box 1 and 2 and 3 ways.,supplying and fixing 2m box with frame and cover plate,supplying and fixing 3m box with frame and cover plate,supplying and fixing 4m box with frame and cover plate,supplying and fixing 6m box with frame and cover plate,supply

Read more
Lv7 stln vf,2530-72-0306867,parts kit power steering,lv7 stln vf,b4457904,s a of return hose from fuel pump to fu,lv7 stln vf,1377-000335,cartridge eng starter primary cartridge,lv7 stln vf,5331-72-0324341,o-ring,lv7 stln vf,x-7472700,engine speed sensor dg 6,lv7 stln,2510-72-0468541,shock absorber front,lv7 stln,4330-000564,filter element coalescer separator,lv7 t-815,452-335-871-506,becon orange 8563.5 201-24v,lv7 tata,t065-6000-0126,cartridge lub.oil filter,lv6-mt6,bbd-niv-000192 vii,liquid cleaner tin 01 tin of 200 ml,lv6-mt6,2640-000192,kit cold patch for tube repair complete,lv7 maruti,24121-83002,shaft main,lv7 maruti,3040-016113,cable parking break no.1,lv7 maruti,31400m70f00,generator assy,lv7 maruti,36620m801m0,harness assy wiring no.1,lv7 maruti,16100m72f00,pump assy oil

Lv7 stln vf,2530-72-0306867,parts kit power steering,lv7 stln vf,b4457904,s a of return hose from fuel pump to fu,lv7 stln vf,1377-000335,cartridge eng starter primary cartridge,lv7 stln vf,5331-72-0324341,o-ring,lv7 stln vf,x-7472700,engine speed sensor dg 6,lv7 stln,2510-72-0468541,shock absorber front,lv7 stln,4330-000564,filter element coalescer separator,lv7 t-815,452-335-871-506,becon orange 8563.5 201-24v,lv7 tata,t065-6000-0126,cartridge lub.oil filter,lv6-mt6,bbd-niv-000192 vii,liquid cleaner tin 01 tin of 200 ml,lv6-mt6,2640-000192,kit cold patch for tube repair complete,lv7 maruti,24121-83002,shaft main,lv7 maruti,3040-016113,cable parking break no.1,lv7 maruti,31400m70f00,generator assy,lv7 maruti,36620m801m0,harness assy wiring no.1,lv7 maruti,16100m72f00,pump assy oil

Read more
Complete wiring of 3 rooms at burragarh siding office of kuya ocp under bastacolla area

Complete wiring of 3 rooms at burragarh siding office of kuya ocp under bastacolla area

Read more
Complete repairing of 100 kva transformer 11kv/440 volt sl. no.- 10025 at ck siding kocp.

Complete repairing of 100 kva transformer 11kv/440 volt sl. no.- 10025 at ck siding kocp.

Read more
Complete electrical wiring repairing of quarter of shri shiv kumar yadav bengali kothi at kocp.

Complete electrical wiring repairing of quarter of shri shiv kumar yadav bengali kothi at kocp.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise