Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Oxide Scale Measurement In Reheater And Superheater Tubes Of Boiler U1 Rt
|
| Description |
|
| Organisation | Contracts and Materials | Ministry of Power |
| Tender Id | GEM/2024/B/5702162 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | December 20, 2024 17:42 |
| End Date |
Expired
17/01/2025
Expired 634 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Procurement of fin welding material for boiler tubes and s.s. plate/rod along with nut-bolt for superheater/reheater coil alignment and boiler expansion indicator assembly for boiler unit-2, 2x600mw, sstpp, stage-i, mppgcl, dongalia.
Read morePyrometer system for flue gas temperature measurement application - spares,pyrometer system for flue gas temperature measurement application– for mirzapur u2,pyrometer system for flue gas temperature measurement application– for mirzapur u1
Pyrometer system for flue gas temperature measurement application - spares,pyrometer system for flue gas temperature measurement application– for mirzapur u2,pyrometer system for flue gas temperature measurement application– for mirzapur u1
Read moreSupply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Supply of erosion protection shields for ltsh terminal tubes and economizer hanger tubes i unit ii boiler
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreBoiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Boiler bed coil pipes for second (02) & third (03) row tubes as per technical specification,boiler bed coil pipes for first (01) & fourth (04) row tubes as per technical specification
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Mtps i bm unit ii boiler pressure parts aoh 2026 rectification replacement of defective tubes in ltsh coils economizer hanger tubes steam cooled side walls and fin welding in boiler iind pass area
Read moreService contract for oh of boiler pr. parts (unit #5) and replacement of platen superheater coil (29 nos) under capex 24-25 during unit#5 oh under bm.
Service contract for oh of boiler pr. parts (unit #5) and replacement of platen superheater coil (29 nos) under capex 24-25 during unit#5 oh under bm.
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 water washing of boiler ist and iind pass area removal of heavy particle of soot deposited on water wall tube platen sh coil and reheater coil etc
Mtps i bm unit ii boiler pressure parts aoh 2026 water washing of boiler ist and iind pass area removal of heavy particle of soot deposited on water wall tube platen sh coil and reheater coil etc
Read moreTtps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Ttps mech ii bm unit iii replacement of boiler pressure parts tubes bends in i pass of unit iii boiler during the year 2026 2027
Read moreof your Industry type