Tender Details

Particulars Details
Title
Fdr Of Road Connecting Machmara And Karaicherra Under Pwd R And B Pecharthal Sub Division Under Pecharthal Constituency During The Year 2025 2026 Sh Construction Of R C C Retaining Wall Back Filling
Description
Fdr Of Road Connecting Machmara And Karaicherra Under Pwd R And B Pecharthal Sub Division Under Pecharthal Constituency During The Year 2025 2026 Sh Construction Of R C C Retaining Wall Back Filling
Organisation Chief Engineer, PWD (R and B) | State Govt. and UT
Tender Id 112158
Reference
Number
12/EE/KD/2025-26
Tender Fee 1000
EMD 36741
Tender Value -
Place Pecharthal
Link
View Original Tender Notice

https://tripuratenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=62622

Start Date May 17, 2025 23:30
End Date
Expired 06/06/2025

Expired 498 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of retaining wall for a length of 0.018kms on rural road connecting veling to khazan in v.p. veling priol cuncoliem in priol constituency of ponda taluka.

Construction of retaining wall for a length of 0.018kms on rural road connecting veling to khazan in v.p. veling priol cuncoliem in priol constituency of ponda taluka.

Read more
Resurfacing of sh 204 from km 53 00 to 60 62 in selected reaches connecting from udigala sh 81 to aldooru gate sh 84 in chamarajanagara taluk in kollegala constituency job no crif knt 2026 27 011

Resurfacing of sh 204 from km 53 00 to 60 62 in selected reaches connecting from udigala sh 81 to aldooru gate sh 84 in chamarajanagara taluk in kollegala constituency job no crif knt 2026 27 011

Read more
Construction of bridge across doni river between hiroor and fatthepur village connecting sh-177 vijayapur ukkali dindawar sasanur mukhihal nalatawada and sh-124 bharked bilgi in muddebihal constituency.(h/a 5054-80-190-0-01-132 krdcl)

Construction of bridge across doni river between hiroor and fatthepur village connecting sh-177 vijayapur ukkali dindawar sasanur mukhihal nalatawada and sh-124 bharked bilgi in muddebihal constituency.(h/a 5054-80-190-0-01-132 krdcl)

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Fdr of road under pwd r and b pecharthal sub division under pecharthal constituency during the year 2024 25 sh construction of r c c retaining wall back filling

Fdr of road under pwd r and b pecharthal sub division under pecharthal constituency during the year 2024 25 sh construction of r c c retaining wall back filling

Read more
Construction of 22 nos. dug injection well for sbdtws at different locations of karaicherra vc, dakshin machmara vc, ramgunapara vc, uttar machmara vc, machmara vc uttar dhanicherra vc under dws sub-division, pecharthal 2023-24

Construction of 22 nos. dug injection well for sbdtws at different locations of karaicherra vc, dakshin machmara vc, ramgunapara vc, uttar machmara vc, machmara vc uttar dhanicherra vc under dws sub-division, pecharthal 2023-24

Read more
Fdr/urgent construction of retaining wall on gonda twisa-amarpur road (l-17.50 km) / sh- retaining wall, back filling etc. portion from ch. 12.00 km to ch. 17.50 km.

Fdr/urgent construction of retaining wall on gonda twisa-amarpur road (l-17.50 km) / sh- retaining wall, back filling etc. portion from ch. 12.00 km to ch. 17.50 km.

Read more
Fdr/urgent construction of retaining wall on ambassa-gonda twisa road (length - 53.00 km) / sh- retaining wall, back filling etc. portion from ch. 30.00 km to ch. 35.00 km.

Fdr/urgent construction of retaining wall on ambassa-gonda twisa road (length - 53.00 km) / sh- retaining wall, back filling etc. portion from ch. 30.00 km to ch. 35.00 km.

Read more
Fdr/urgent construction of retaining wall on gonda twisa-raishyabari road (length - 28.50 km) / sh- retaining wall, back filling etc. portion from ch. 15.00 km to ch. 25.00 km. (group-i)

Fdr/urgent construction of retaining wall on gonda twisa-raishyabari road (length - 28.50 km) / sh- retaining wall, back filling etc. portion from ch. 15.00 km to ch. 25.00 km. (group-i)

Read more
Extension of ht/lt line for providing 3 (three) phase service connection to the establishment of modern abattoir for pig cum pork processing plant construction at karaicherra, machmara under esd-pecharthal

Extension of ht/lt line for providing 3 (three) phase service connection to the establishment of modern abattoir for pig cum pork processing plant construction at karaicherra, machmara under esd-pecharthal

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise