Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
13. Impr To Kuchi Vadgaon Road V.R.156 Section Kuchi To Vadgaon Ch 0.00 To 1.00 At Kuchi Tal.K.Mahanakal
|
| Description |
13. Impr To Kuchi Vadgaon Road V.R.156 Section Kuchi To Vadgaon Ch 0.00 To 1.00 At Kuchi Tal.K.Mahanakal
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_SANGL_962976_13 |
|
Reference Number |
22/2023-24 |
| Tender Fee | 500 |
| EMD | 13000 |
| Tender Value | - |
| Place | Executive Engineer B and C Z P Sangli |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | November 16, 2023 22:30 |
| End Date |
Expired
23/11/2023
Expired 1058 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenanceof nh-206 kadur to nh-13 holalkere via hirenalluru yaraganahalli state highway (sh-153) at ch 0.00 to 20.80 km in ajjampura taluk.
Annual maintenanceof nh-206 kadur to nh-13 holalkere via hirenalluru yaraganahalli state highway (sh-153) at ch 0.00 to 20.80 km in ajjampura taluk.
Read moreKanupur - bahutali road from ch. 0.50 km. to 1.00 km., ch. 2.50 km. to 3.50 km., ch. 5.70 km. to 6.90 km., ch. 8.00 km to 8.40 km. and ch. 8.80 km. to 12.20 km. patch repairing work in stretches (except bridge and culvert) under murshidabad highway
Kanupur - bahutali road from ch. 0.50 km. to 1.00 km., ch. 2.50 km. to 3.50 km., ch. 5.70 km. to 6.90 km., ch. 8.00 km to 8.40 km. and ch. 8.80 km. to 12.20 km. patch repairing work in stretches (except bridge and culvert) under murshidabad highway
Read moreEngaging manpower and machineries for water management of right bank canal from ch 0.00 to 10.00 km ch 50.00 to 65.00 km. and distry-12 at ch 33.05 km under bnt project for 2026-27
Engaging manpower and machineries for water management of right bank canal from ch 0.00 to 10.00 km ch 50.00 to 65.00 km. and distry-12 at ch 33.05 km under bnt project for 2026-27
Read moreSpecial repair work from ch. 0.00 to ch. 10.80 mohania to bhabhua total length 10.80 km of nh219 for the year 2026 27 in the state of bihar.
Special repair work from ch. 0.00 to ch. 10.80 mohania to bhabhua total length 10.80 km of nh219 for the year 2026 27 in the state of bihar.
Read moreDevelopment of road from killa to dakbari (t-i) from ch 0.00 to 4.00 km (l 4.00km) under killa block
Wbm in patches, grouting, re-carpeting, seal coat and allied works etc
Read moreSpecial repair work construction of rcc drain size 1.00 m x 1.25 m from ch. 96.600 to ch. 99.100 total length 5.00 km in daudnagar market of nh 139 for the year 2026-27
Special repair work construction of rcc drain size 1.00 m x 1.25 m from ch. 96.600 to ch. 99.100 total length 2 x 2.5 5.0 km in daudnagar market of nh 139 for the year 2026-27
Read moreDevelopment of road from sonamura-boxagnagar road to jumertila (l-0.250 km) sh pucca drain wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.130 km
Development of road from sonamura-boxagnagar road to jumertila (l-0.250 km) sh pucca drain wbm 3 paver block and other allied works portion from ch. 0.00 km to ch. 0.130 km
Read moreUrgent repair works 0.00 kmp to 1.00 kmp in patches chaulkhola mandarmani road under contai sub-division under tamluk division, pwd in the district of purba medinipur in the year 2026-2027
Urgent repair works 0.00 kmp to 1.00 kmp in patches chaulkhola mandarmani road under contai sub-division under tamluk division, pwd in the district of purba medinipur in the year 2026-2027
Read moreSpecial repair to bldg no ch-03,jm ch-01,oj 04,oj-11 and oj-13 at lekhapani mil stn under ge dinjan no.2
Special repair to bldg no ch-03,jm ch-01,oj 04,oj-11 and oj-13 at lekhapani mil stn under ge dinjan no.2
Read moreRepairs and strengthening of slab drains at ch 1 570 3 055 4 560 cr escape at ch 0 912 2 735 12 735 nala syphon at ch 7 396 and reconstruction of vrb at ch 13 710 of surya left bank canal
Repairs and strengthening of slab drains at ch 1 570 3 055 4 560 cr escape at ch 0 912 2 735 12 735 nala syphon at ch 7 396 and reconstruction of vrb at ch 13 710 of surya left bank canal
Read moreof your Industry type