Tender Details

Particulars Details
Title
Dismantling, Fabrication, Erection Of Boiler Tubes And Header Replacement Of Boiler.
Description
Dismantling, Fabrication, Erection Of Boiler Tubes And Header Replacement Of Boiler.
Organisation Government of Uttar Pradesh
Tender Id 2023_KSCML_822198_1
Reference
Number
500/PS/Tender/01/2023-24
Tender Fee 590
EMD 25000
Tender Value -
Place Hasanpur
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date July 18, 2023 23:30
End Date
Expired 24/07/2023

Expired 1176 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.

Supply, fabrication, erection, testing and commissioning of 30meter hight ms structural steel chimney work at opp kallurugudem, khammam dist,telangana state.

Read more
Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Bmd- removal and re-fixing of insulation including metal cladding on water wall tubes, pent house, steam connected valves and burner area and replacement of refractory at rh rear arch area, manual access doors and other locations of boiler at 1 x 500 mw ktpp unit for the year 2026-27 during capital overhaul works

Read more
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg

Read more
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).

Read more
(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting

(a) erection /dismantling of poles along with conductors and other associated accessories 3.3 kv o/h line (feeder 1, feeder 2 , feeder 3 and feeder 4), and installation of 11 kv grade goab switch, installation of lighting transformer, switch shifting

Read more
Dismantling fabrication and erection of tubes in boiler

Dismantling fabrication and erection of tubes in boiler

Read more
Fabrication and erection work of boiler tubes

Fabrication and erection work of boiler tubes

Read more
Fabrication of economiser tubes in boiler and dismentling erection fabrication in boiler roof

Fabrication of economiser tubes in boiler and dismentling erection fabrication in boiler roof

Read more
Tender for supply , dismantling, fabrication and erection of injection header .

Tender for supply , dismantling, fabrication and erection of injection header .

Read more
Supply fabrication erection dissmantelling replacement of super heater coils header tube of boiler mp 4637 and boiler mp 3561

Supply fabrication erection dissmantelling replacement of super heater coils header tube of boiler mp 4637 and boiler mp 3561

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise