Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fuel Deflector Plates With Hard Facing As Per Drawing
|
| Description |
|
| Organisation | Materials Management | Ministry of Coal |
| Tender Id | GEM/2024/B/4548240 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 29, 2024 23:15 |
| End Date |
Expired
19/02/2024
Expired 965 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
EWAC ALLOYS LIMITED
3256800
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | EWAC ALLOYS LIMITED | Make : EWAC Model : EWAC Title : ZDP 952 | 19-02-2024 13:13:15 | MII | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | EWAC ALLOYS LIMITED(MII) | Item Categories : FUEL DEFLECTOR PLATES WITH HARD FACING AS PER DRAWING | 3469200.00 | L1 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| ZDP 952 | EWAC | EWAC | 12 | ₹ 3256800.000 |
Supply and fixing of circuit plates,number plates,phase plates,danger boards and anti climbing devices in 132kv minpur-jogipet,132kv minpur-wattipally and 132kv wattipally-jogipet lines in onm division,narsapur.
Supply and fixing of circuit plates,number plates,phase plates,danger boards and anti climbing devices in 132kv minpur-jogipet,132kv minpur-wattipally and 132kv wattipally-jogipet lines in onm division,narsapur.
Read moreBtps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Btps-chp-reconditioning and hard facing of suspension center and end discs for ring granulator-2 and 4 of chp, btps from 01.08.2026 or actual date of commencement of work to 31.03.2027 as and when required in mm-ii subdivision of mm/chp/btps.
Read moreSupply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Supply of clinker grinder body, wear plates and drive sprockets for bottom ash handling system
Read moreRemaining work of consultancy services for preparation of dpr including land acquisition and detailed design and drawing design and drawing of road and rob (1nos) for construction of bye pass from sikar-jhunjhunu road (sh-08) to jhunjhunu chirawa ..
Remaining work of consultancy services for preparation of dpr including land acquisition and detailed design and drawing design and drawing of road and rob (1nos) for construction of bye pass from sikar-jhunjhunu road (sh-08) to jhunjhunu chirawa ..
Read moreTender document for rate contract for hiring of vehicles on monthly and daily -basis(with driver fuel and maintenance)
Tender document for rate contract for hiring of vehicles on monthly and daily -basis(with driver fuel and maintenance)
Read moreOperation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Operation and supply of fuel in dg set along with lube oil and filter replacement in 33/0.433 kv substation at vikas bhawan, patna for one year.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.
Read moreof your Industry type