Tender Details
Particulars | Details |
---|---|
Title |
Ttps Es Circle Em Ii Replacement Of Existing Coal Mill Motor Having Sl No 31120000 12 By Spare Motor Vide Sl.No 31152000 9 At 1 D Location In Unit I And Other Allied Overhauling Works Of Motor As A Healthy Spare
|
Description |
Ttps Es Circle Em Ii Replacement Of Existing Coal Mill Motor Having Sl No 31120000 12 By Spare Motor Vide Sl.No 31152000 9 At 1 D Location In Unit I And Other Allied Overhauling Works Of Motor As A Healthy Spare
|
Organisation | TNEB Limited | State Govt. and UT |
Tender Id | 2024_EB_498855_1 |
Reference Number |
CE/SE/ES /TTPS /No.262/2024-25 |
Tender Fee | 0 |
EMD | 1900 |
Tender Value | |
Place | TTPS |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=592876 |
Start Date | November 05, 2024 21:30 |
End Date |
20/11/2024 ( Expired 199 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ttps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit v replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreTtps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Ttps operation circle mpm ii unit iv replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
Read moreTtps es circle em i overhauling of 3 nos leaky electrolytic cells in hydrogen plant ii
Ttps es circle em i overhauling of 3 nos leaky electrolytic cells in hydrogen plant ii
Read moreTtps es circle em ii new proposal for erection and commissioning of spare hpwp motor 260kw 6 6kv 1486 rpm sl no 3810104 3 make kirlosker electric ltd at ahp stage i
Ttps es circle em ii new proposal for erection and commissioning of spare hpwp motor 260kw 6 6kv 1486 rpm sl no 3810104 3 make kirlosker electric ltd at ahp stage i
Read moreTtps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm-i unit ii overhauling of roller journal assembly and replacement of worn out grinding roller for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm i unit i, ii iii mills checking the alignment of mill motor with gearbox and setting the axial and radial clearance for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i unit i, ii iii mills checking the alignment of mill motor with gearbox and setting the axial and radial clearance for the period from 01.04.2025 to 31.03.2026
Read moreTtps es circle em i charges for load testing of two nos 125 25 t eot cranes no 347 and 348 in unit i ii and iii
Ttps es circle em i charges for load testing of two nos 125 25 t eot cranes no 347 and 348 in unit i ii and iii
Read moreTtps operation circle mpm i unit-ii upkeepment, cleaning of mills, mill floor and leak arresting in mills and coal pipes from mills to boiler for the period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i unit-ii upkeepment, cleaning of mills, mill floor and leak arresting in mills and coal pipes from mills to boiler for the period from 01.04.2025 to 31.03.2026
Read moreTtps operation circle mpm i unit ii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Ttps operation circle mpm i unit ii collecting of coal rejects from the mill chute, dumping in the specified area, clearing the same, loading, transporting and dumping in a specified area of ttps for a period from 01.04.2025 to 31.03.2026
Read moreTtps es circle em i water wash cleaning the generator transformer bushings lightning arrestor and support insulators for the year 2025 26 for unit i ii and iii
Ttps es circle em i water wash cleaning the generator transformer bushings lightning arrestor and support insulators for the year 2025 26 for unit i ii and iii
Read moreof your Industry type