Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Manufacturing And Assembly Of Engine Fuel Control System Line Replaceable Units
|
Description |
Manufacturing And Assembly Of Engine Fuel Control System Line Replaceable Units
|
Organisation | Department of Defence Research and Development | Central Govt. Ministry/Department |
Tender Id | 2025_DRDO_703446_1 |
Reference Number |
GTRE/MMG/EFCS/6313/24 |
Tender Fee | 0 |
EMD | 60.5 Lakh |
Tender Value | |
Place | GTRE, Bengaluru |
Link | https://defproc.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=787953 |
Start Date | April 04, 2025 14:30 |
End Date |
22/05/2025 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar
Read moreDesign, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp
Read moreNotice inviting tender for selection of system integrator (si) to design, develop, implement and maintain erp system of ifsca
Notice inviting tender for selection of system integrator (si) to design, develop, implement and maintain erp system of ifsca
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreAppointment of consultant for verification, rating and monitoring of the facilities and infrastructure such as wayside amenities, fuel stations, eateries, trauma centres, including facilities under humsafar policy, etc. along national highways
Appointment of consultant for verification, rating and monitoring of the facilities and infrastructure such as wayside amenities, fuel stations, eateries, trauma centres, including facilities under humsafar policy, etc. along national highways
Read morePackage iii civil works of water conductor system and power house complex of tato ii hydro electric project
Package iii civil works of power intake, head race tunnel, surge shaft, valve chamber, pressure shafts and penstock, underground powerhouse complex (comprising of powerhouse cavern, transformer - gis cavern, etc. of tato ii hep
Read moreCustom bid for services - outsourcing of manufacturing of 156 line of pin,ram rod,shsft,plug,bush e
Read more
Selection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years
Selection of bidder for implementation of automatic fare collection system on design, develop, build, install, maintain, operate and transfer (boot) model for 4 years
Read moreof your Industry type