Tender Details
Particulars | Details |
---|---|
Title |
Repair And Restoration Work Of Swamy Sannathi, Arthamandabham , Mahamandabam,Garudazhwar Sannathi , Praharam Flooring And Construction Of New Compound Wall
|
Description |
Repair And Restoration Work Of Swamy Sannathi, Arthamandabham , Mahamandabam,Garudazhwar Sannathi , Praharam Flooring And Construction Of New Compound Wall In Arulmigu Aanaikkaathaperumal Temple, Kalappal Village Mannarkudi Taluk Thiruvarur District
|
Organisation | Hindu Religious and Charitable Endowments | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 39200 |
Tender Value | |
Place | Aanaikkaathaperumal Temple, Kalappal |
Link |
AAAAAAAAAA Login to view |
Start Date | May 09, 2025 15:30 |
End Date |
26/05/2025 ( 14 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreDevelopment of keshod airport, keshod (gujarat)
Detailed designing, engineering, procurement and construction of new domestic terminal building with parking, atc tower cum technical block, fire station, electrical sub-station, approach roads, ancillary structures, allied works and associated mep a
Read moreRoad,boundary wall and drainage work at cycle park within vidyasagar industrial park, kharagpur
Compound road with drainage system and peripheral boundary wall at cycle park (20 acres) within vidyasagar industrial park, kharagpur-i in the district of paschim medinipur
Read moreStrengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Strengthening of existing service road 7.51 km length and construction of new service road in 0.33 km length as rigid pavement on obedullaganj-itarsi section of nh-46 in the state of madhya pradesh on epc mode
Read moreShort term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Read moreShort term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Read moreMaintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Maintenance of existing borewell, rain water harvesting pits, installation of new borewells and construction of new rain water harvesting system at mkpr-mvpi (excluding) of line-7, mkd, mksq, mkpr rss, dkv rss, ina rss.
Read moreDesljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Desljtc of 220kv d/c u/g 1200 sq. mm xlpe cable for upcoming 220 kv tss of northern railway (at tughlakabad) from 220 kv s/s btps and setc of 02 no. 220 kv feeders for nr with associated civil work at 220 kv s/s btps new delhi on turnkey basis.
Read moreof your Industry type