Tender Details
About Tender
🏭 Bharat Sanchar Nigam Limited (Bsnl) Rfp For Power Plant Wiring 🔌 Bharat Sanchar Nigam Limited (Bsnl), A Government Of India Enterprise, Has Issued A Request For Proposal (Rfp) For The Provision Of Pvdg (Pre Insulated, Double Wall) Wiring For A New Power Plant At Flat No. 1 And From Flat No. 09 In The Te Building At Ngv Koramangala, Bgl. 📅 Submission Deadline: May 11, 2024, 4:00 Pm Tender Fee: Inr 177 Emd: Inr 955 Interested Electrical Contractors Must Submit Detailed Proposals, Including Technical Specifications, Methodology, And Cost Estimates, Adhering To The Project's Requirements And Timelines. Keywords: Bharat Sanchar Nigam Limited, Power Plant Wiring, Pvdg, Rfp, Government Of India Enterprise, Electrical Contractors, Bgl Koramangala, NgvParticulars | Details |
---|---|
Title |
10/Cee/Kez/Bsnl/Bgl/2024 2025
|
Description |
Pvdg Wiring For New Power Plant At Flat No1and From Flat No09 In Te Bldg Ngv Koramangala
|
Organisation | Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings |
Tender Id | 2024_BSNL_194627_1 |
Reference Number |
10/CEE/KEZ/BSNL/BGL/2024-2025 |
Tender Fee | 177 |
EMD | 955 |
Tender Value | |
Place | NGV Koramangala BGL |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=213052 |
Start Date | May 02, 2024 23:30 |
End Date |
11/05/2024 ( Expired 371 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConst. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Const. of 6lane gf ing from its junc with nh4b(new nh348)near pagote (km.0.000) till its junc on nh48 at chowk(design km.29.219) in maharashtra to be d on bot mode under nh (o)
Read moreSupply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreBess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh
Bess package bess-01 for setting up of battery energy storage system of 5mw/ 20mwh capacity co-located with 85 mw solar pv power plant at nagda, ujjain, madhya pradesh
Read moreIe for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham
Read moreManufacturing and supply of high pressure cold drawn seamless steel tubes for use in high pressure boilers at various thermal power stations of m.p. power generating co. ltd.
Manufacturing and supply of high pressure cold drawn seamless steel tubes for use in high pressure boilers at various thermal power stations of m.p. power generating co. ltd.
Read moreof your Industry type