Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
D/G Eot Cranes Up To 100 T For 2x660 Mw Udangudi Stpp Stage I
|
Description |
|
Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
Tender Id | GEM/2024/B/5522840 |
Reference Number |
|
Tender Fee | |
EMD | |
Tender Value | |
Place | |
Link | https://bidplus.gem.gov.in/all-bids |
Start Date | October 19, 2024 23:44 |
End Date |
30/10/2024 ( Expired 241 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Proposal for hiring of 01 no. air conditioned diesel suv 8plus1 seater or more with minimum engine capacity 1450 cc for use of pool vehicle for transportation of officers and employees from lift to power house at 3x105 mw, thps i, sirmour with 1 dri
Proposal for hiring of 01 no. air conditioned diesel suv 8plus1 seater or more with minimum engine capacity 1450 cc for use of pool vehicle for transportation of officers and employees from lift to power house at 3x105 mw, thps i, sirmour with 1 dri
Read moreProcurement of high density balancing weights for tg sets of 2x210 mw units at stage-i, ghtp lehra mohabbat
Procurement of high density balancing weights for tg sets of 2x210 mw units at stage-i, ghtp lehra-mohabbat .total quantity as per nit
Read moreLot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir
Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india
Read moreTn-11172 supply of alloy ci fittings, spares for bottom ash hopper and fly ash system of ash handling plant stage, i to v, unit 1 to 7, kstps, kota.
Supply of alloy ci fittings, spares for bottom ash hopper and fly ash system of ash handling plant stage, i to v, unit 1 to 7, kstps, kota.
Read moreAll risk comprehensive package mega risk policy including terrorism and third party liability policy for jkspdc 900 mw baglihar power station (stage i and ii), chanderkote, district ramban, jammu and kashmir
All risk comprehensive package mega risk policy including terrorism and third party liability policy for jkspdc 900 mw baglihar power station (stage i and ii), chanderkote, district ramban, jammu and kashmir
Read moreSriramsagar project-stage-i
Flood damage permanent estimate for emergent repairs to surplus weir of krishnadri cheruvu choulamaddi (v) metpally (m) jagtial ( dist)
Read moreMtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Mtps i mill plant ac plant ac cooling tower stage i ii sump tank overflow water drain line laying rerouting to bottom ash hopper unit i trench for zero discharge of a zone area and providing an accessories of water level indicator for sump tanks
Read moreRoutine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.
Routine earth work for maintenance of rising and distribution mains up to 300 mm dia c i and d.i. and gi pipe lines including maintenance of valves etc. upto 300 mm dia at ctps colony, dvc, chandrapura.
Read moreRehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Rehabilitation and up-gradation to 2 lane with paved shoulder configuration for the work of charthana jintur section of nh 752 i from design km.25 100 to 47 100 design length 22 00 km in the state of maharashtra on epc mode
Read moreRequest for expression of interest for debt financing of rs. 7,200 crores for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district.
Request for expression of interest for debt financing of rs. 7,200 crore for setting up of 1 x 800 mw super critical unit (stage-ii) at pegadapalli village, jaipur mandal, mancherial district.
Read moreof your Industry type