Tender Details
Particulars | Details |
---|---|
Title |
Provision Of Quick Watering System For Coach Watering For Pf 1&Amp2, Pf 3&Amp4 And Pf 5 At Vizianagaram (Vzm) Station.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79758049 |
Reference Number |
eT-EAST-WAT-04-2025 |
Tender Fee | 0 |
EMD | 3.13 Lakh |
Tender Value | |
Place | Bhubaneswar |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/022025/79758049/viewNitPdf_4846218.pdf |
Start Date | January 25, 2025 18:18 |
End Date |
19/02/2025 ( Expired 62 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Design manufacture supply installation testing commissioning training and maintenance of station level equipment of afc system for cmrl phase ii - corridor 3 and corridor 5 including replacement and retrofitting of phase i station level equipment.
Read moreDesign and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Design and build of pedestrian skywalk at banashankari intersection including connectivity between banashankari metro station and ttmc building along with shifting of utilities, tree removal, landscaping, electrical (lt and ht) works etc. for bmrcl.
Read moreProvision of new building for rnd equipment and test facilities under htcc at rci, hyderabad
Provision of new building for rnd equipment and test facilities under htcc at rci, hyderabad
Read moreRequest for proposal for selection of system integrator (erpsi) for supply, installation, commissioning, implementation and support for enterprise resource planning (erp) system at power department sikkim
Request for proposal for selection of system integrator (erpsi) for supply, installation, commissioning, implementation and support for enterprise resource planning (erp) system at power department sikkim
Read moreSupply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Supply, installation, testing and commissioning of electrical, hvac, announcement system, elv system and other associate works on sub contract basis in connection with re-development of ernakulam junction railway station at ernakulam, kerala
Read moreWork services for resurfacing of pavements and operating surfaces at af station jodhpur
Work services for resurfacing of pavements and operating surfaces at af station jodhpur
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Inviting rates of construction material with complete work given below for yearly (2025-26) 1- fly ash brick, 2- cement plaster, 3-soil excavation, 4-m-15 concrete, 5-profile sheet, 6- m.s. square pipe
Read moreInviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Inviting rates of construction material with complete work given below for yearly (2025-26) providing and fixing of tiles/ stone with cement concrete. 1-kota stone, 2- marble stone, 3- granite stone, 4- flag stone, 5- acupressure tiles.
Read moreDesign and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Design and execution for construction of 400 m length avalanche protection system at km 5.550 to km 5.660, km 7.900 to km 7.950, km 27.200 to km 27.280, km 28.370 to km 28.460 and km 29.200 to km 29.270 on d-s rd i.e. approach road to shinkunla tnl
Read moreBudgetary inquiry for supply, installation, testing and commissioning of fire fighting system at wilson house, sangam house, ambedkar bhavan and hamallage building
Budgetary inquiry for supply, installation, testing and commissioning of fire fighting system at wilson house, sangam house, ambedkar bhavan and hamallage building
Read moreof your Industry type