Tender Details

Particulars Details
Title
Laying Of 11 Kv 3 Cx300 Sq.Mm. Xlpe Ug Cable With Allied Works For Evacuation Of Power From Eternis 33/11 Kv Substation Under Barasat Division.
Description
Laying Of 11 Kv 3 Cx300 Sq.Mm. Xlpe Ug Cable With Allied Works For Evacuation Of Power From Eternis 33/11 Kv Substation Under Barasat Division.
Organisation WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT
Tender Id 2024_WBSED_767537_1
Reference
Number
RM/24PNR/ELEC/2024-25/12
Tender Fee 0
EMD 89600
Tender Value
Place Ganganagar, Barasat
Link https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1700653
Start Date November 14, 2024 15:30
End Date

25/11/2024 ( Expired 146 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.

Read more
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km

Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km

Read more
Construction of power evacuation system for development of 2450 mw solar park at pugal, bikaner

Construction of power evacuation system for development of 2450 mw solar park at pugal, bikaner under lot-1, lot-2 and lot-3 including survey, design, engineering, supply of all equipments /materials, etc along with associated civil works on turnk

Read more
Renovation of crb and 69.30 mtr. tilted boundary wall with retaining wall (1.50 m height) and other ancillary civil work at joypur 33/11 kv sub-station under purulia division, dist. purulia.

Renovation of crb and 69.30 mtr. tilted boundary wall with retaining wall (1.50 m height) and other ancillary civil work at joypur 33/11 kv sub-station under purulia division, dist. purulia.

Read more
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period

Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period

Read more
Construction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028

Construction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028

Read more
Sitc of 11/33 kv transformer for the integration of existing 1mwp solar power plant with the upcoming 33kv power supply system at rajahmundry airport

Sitc of 11/33 kv transformer for the integration of existing 1mwp solar power plant with the upcoming 33kv power supply system at rajahmundry airport

Read more
Addition/alteration, repair/maintenance and allied do/bos/sos and staff quarter repair/maintenance and allied works for various buildings of taff quarters under bardhaman and asansol division, west bengal

Addition/alteration, repair/maintenance and allied &#x0d do/bos/sos and staff quarter&#x0d repair/maintenance and allied works for various buildings of&#x0d staff quarters under bardhaman and asansol division, west &#x0d bengal

Read more
Development and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.

Development and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.

Read more
Estimate for power evacuation from phoolbag ehv toward prem motors under htm division city circle gwalior

Estimate for power evacuation from phoolbag ehv toward prem motors under htm division city circle gwalior

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise