Tender Details
Particulars | Details |
---|---|
Title |
Laying Of 11 Kv 3 Cx300 Sq.Mm. Xlpe Ug Cable With Allied Works For Evacuation Of Power From Eternis 33/11 Kv Substation Under Barasat Division.
|
Description |
Laying Of 11 Kv 3 Cx300 Sq.Mm. Xlpe Ug Cable With Allied Works For Evacuation Of Power From Eternis 33/11 Kv Substation Under Barasat Division.
|
Organisation | WEST BENGAL STATE ELECTRICITY DISTRIBUTION CO. LTD | State Govt. and UT |
Tender Id | 2024_WBSED_767537_1 |
Reference Number |
RM/24PNR/ELEC/2024-25/12 |
Tender Fee | 0 |
EMD | 89600 |
Tender Value | |
Place | Ganganagar, Barasat |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1700653 |
Start Date | November 14, 2024 15:30 |
End Date |
25/11/2024 ( Expired 146 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreTermination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Termination of the lilo of 220 kv sherpur jhajra at 120 mw vyasi hep ujvnl for direct at 400 kv substation sherpur pgcil with a line length of apx 2.5 km partially o h approx. 1.5 km with multi-circuit towers and partially with ug apx length 1 km
Read moreConstruction of power evacuation system for development of 2450 mw solar park at pugal, bikaner
Construction of power evacuation system for development of 2450 mw solar park at pugal, bikaner under lot-1, lot-2 and lot-3 including survey, design, engineering, supply of all equipments /materials, etc along with associated civil works on turnk
Read moreRenovation of crb and 69.30 mtr. tilted boundary wall with retaining wall (1.50 m height) and other ancillary civil work at joypur 33/11 kv sub-station under purulia division, dist. purulia.
Renovation of crb and 69.30 mtr. tilted boundary wall with retaining wall (1.50 m height) and other ancillary civil work at joypur 33/11 kv sub-station under purulia division, dist. purulia.
Read moreDesign, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom norms including comprehensive o and m for 11yrs with 02 yrs guarantee period
Design, engineering, sitc of 6.0 mw wind farm on epc mode at vocpa, tuticorin along with civil works and power evacuation system to be connected with grid as per discom tnpdcl norms including comprehensive oand m for 11yrs with 02yrs guarantee period
Read moreConstruction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028
Construction work of new 33 kv line from substation dudhtalai to saint paul s/s division ujjain city west circle ujjain for simhastha-2028
Read moreSitc of 11/33 kv transformer for the integration of existing 1mwp solar power plant with the upcoming 33kv power supply system at rajahmundry airport
Sitc of 11/33 kv transformer for the integration of existing 1mwp solar power plant with the upcoming 33kv power supply system at rajahmundry airport
Read moreAddition/alteration, repair/maintenance and allied do/bos/sos and staff quarter repair/maintenance and allied works for various buildings of taff quarters under bardhaman and asansol division, west bengal
Addition/alteration, repair/maintenance and allied 
 do/bos/sos and staff quarter
 repair/maintenance and allied works for various buildings of
 staff quarters under bardhaman and asansol division, west 
 bengal
Read moreDevelopment and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.
Development and widening to two lane with paved shoulder work from km 0.00 (hajma chowk) to km 4.00 (ramnagar) of nh 527e, under nh division, samastipur for the year 2024_25.
Read moreEstimate for power evacuation from phoolbag ehv toward prem motors under htm division city circle gwalior
Estimate for power evacuation from phoolbag ehv toward prem motors under htm division city circle gwalior
Read moreof your Industry type