Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Niet 10 Of 2023 24 Sl.03 Construction Of Proposed Underground Water Reservoir With Pump Room ,Tube Well And Raising Of Boundary Wall With Gate At Howrah Commercial And Industrial Park, Howrah Maidan,24, Belilious Road, Dist Howrah,Pin 711101.2nd Call
|
Description |
Construction Of Proposed Underground Water Reservoir With Pump Room ,Tube Well And Raising Of Boundary Wall With Gate At Howrah Commercial And Industrial Park, Howrah Maidan, 24, Belilious Road, Dist Howrah,Pin 711101. 2nd Call.
|
Organisation | Government of West Bengal |
Tender Id | 2023_MSMET_554342_3 |
Reference Number |
NIET 10 of 2023-24 |
Tender Fee | 2360 |
EMD | 56386 |
Tender Value | |
Place | Shilpa Bhavan |
Link | https://wbtenders.gov.in |
Start Date | August 04, 2023 22:30 |
End Date |
29/08/2023 ( Expired 656 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Niet 05 of 2025-26 sl 03 upgradation of drainage system including balance work in connection with gate, roof treatment, toilet blocks, internal road, repairing and reconstruction of boundary wall, etc. at durgapur commercial park, dist. paschim bard
Upgradation of drainage system including balance work in connection with gate, roof treatment, toilet blocks, internal road, repairing and reconstruction of boundary wall, etc. at durgapur commercial park, dist. paschim bardhaman (civil work)
Read moreLaying of additional water distribution pipeline for flender and wbsedcl along with supply,delivery and installation of monoblock submersible pump inside the underground reservoir at kharagpur industrial park, sector-b, dist- west medinipur,pin-721
Laying of additional water distribution pipeline for flender and wbsedcl along with supply,delivery and installation of monoblock submersible pump inside the underground reservoir at kharagpur industrial park, sector-b, dist- west medinipur,pin-721
Read moreNiet 6 of 2025-26 sl 03 surging of existing tube well and fixing of valve chamber at santoshpur industrial park.
Surging of existing tube well and fixing of valve chamber at santoshpur industrial park.&#x0d
Read moreConstruction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at chandipur 33/11
Read moreConstruction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Construction of control room building, equipment foundation, switchyard development, retaining wall, boundary wall, culvert, fencing wall, approach road and sinking of 1 no tube well (100mmx50mm) dia including submersible pump motor 1.5 hp at propose
Read moreConstruction of oht tube well pump house toilet boundary wall and laying and jointing of rising main and distribution system, providing household connection with amr water meter work of sanskrati lok colony water supply scheme under sasci programe
Construction of oht tube well pump house toilet boundary wall and laying and jointing of rising main and distribution system, providing household connection with amr water meter work of sanskrati lok colony water supply scheme under sasci programe
Read moreConstruction of control room building, bw wall along with equipment foundation, switchyard development, internal road and other allied works for 33by11 kv ais substation at proposed shilpobroto industrial park, radhabari, under jalpaiguri division
Construction of control room building, bw wall along with equipment foundation, switchyard development, internal road and other allied works for 33by11 kv ais substation at proposed shilpobroto industrial park, radhabari, under jalpaiguri division
Read moreNiet23 of 2024-25,sl.01,upgradation of road, boundary wall, water supply, drainage work, pump room, security room, parking area and building at raiganj commercial park, raiganj, district uttar dinajpur.
Upgradation of road, boundary wall, water supply, drainage work, pump room, security room, parking area and building at raiganj commercial park, raiganj, district uttar dinajpur.
Read moreBalance and additional works for sinking of 300x200 mm dia x 210 mtr deapth rrm tube well and laying pipe line (lds),fhtc,construction of switch room,pump house,interconnection along with road restoration and construction of boundary wall for head wo
Balance and additional works for sinking of 300x200 mm dia x 210 mtr deapth rrm tube well and laying pipe line (lds),fhtc,construction of switch room,pump house,interconnection along with road restoration and construction of boundary wall for head
Read moreSinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de
Sinking of 20 nos tube well of size 300x200 mm dia. and 146 mtr. deep by direct rotary rig method using upvc pipes. boundary wall 40 mtr each with one number gate for each tube well at zone -1,2 and 3 size -(10 x 10) sqm each. pump room as per de
Read moreof your Industry type