Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Engagement Of Detailed Design Consultants For Proof Checking Of Civil Structural Works For Corridor Of 28.5 Km Length Having 27 Stations (Main Corridor From Millennium City Centre To Cyber City, Gurugram
|
Description |
Engagement Of Detailed Design Consultants For Proof Checking Of Civil Structural Works For Corridor Of 28.5 Km Length Having 27 Stations (Main Corridor From Millennium City Centre To Cyber City, Gurugram
|
Organisation | Haryana Board Corporation | State Govt. and UT |
Tender Id | 2024_HBC_420542_1 |
Reference Number |
GMRL/PROJ/2024/PC/02 |
Tender Fee | 21180 |
EMD | 3.45 Lakh |
Tender Value | |
Place | Gurugram |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=497223 |
Start Date | January 10, 2025 17:30 |
End Date |
27/01/2025 ( Expired 145 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Structural repair, retrofitting and other civil maintenance work of piers, viaducts, station buildings, depot, rss and other structures of line-2 (south) from udyog bhawan to millennium city centre metro station.
Structural repair, retrofitting and other civil maintenance work of piers, viaducts, station buildings, depot, rss and other structures of line-2 (south) from udyog bhawan to millennium city centre metro station.
Read moreGeneral- one time maintenance 2024-25-attingal town bypass in kadambattukonam - kazhakuttom section of nh-66 - length - 10.6 km - from manamboor ch.527/500 to mamom ch.538/100 - general civil work
This work is proposed for the otm works in attingal town bypass of nh-66, from manamboor ch.527/500 to mamom ch.538/10, for a length of 10.60 km.
Read moreConsultancy service for proof checking, assisting supervision of work, quality control of upgradation and strengthening to 2 lane_ps from km. 95.500 to 129.775 of nh168g idar-bhiloda-samlaji in the state of gujarat under epc mode (length 34.275km)
2nd consultancy service for proof checking, assisting supervision of work, quality control of upgradation and strengthening to 2 lane_ps from km. 95.500 to 129.775 of nh168g idar-bhiloda-samlaji in the state of gujarat under epc mode (length 34.275km
Read moreArchitectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Architectural finishing works including interior fitouts design and construction of external facade water supply sanitary installation, drainage for 07 elevated stations from. esic nagar to bandra of metro line 2b corridor d.n. nagar to mandale
Read moreSc for supervision for four laning of itarsi to betul section of nh46 from km 63.000 to km 137.000 design length 53.045 km excluding tiger corridor in the state of mp package ii nh69 on epc mode
Sc for supervision for four laning of itarsi to betul section of nh46 from km 63.000 to km 137.000 design length 53.045 km excluding tiger corridor in the state of mp package ii nh69 on epc mode
Read moreEngagement of consultant for providing consultancy services including survey detailed investigations study structural design estimation preparation of detailed project report getting it vetted from state technical agency and proof checking from chief
Engagement of consultant for providing consultancy services including survey detailed investigations study structural design estimation preparation of detailed project report getting it vetted from state technical agency and proof checking from chief
Read moreCs for ie for 4/6 laning of marutharoad to edathanattukara section of nh966 from km. 0.000 to km.61.440 (design length 61.279 km) (civil package 1 n 2) in kerala in ham mode under bharatmala pariyojana.
Cs for ie for 4/6 laning of marutharoad to edathanattukara section of nh966 from km. 0.000 to km.61.440 (design length 61.279 km) (civil package 1 n 2) in kerala in ham mode under bharatmala pariyojana.
Read moreCs for ie for 4 or 6 laning of edathanattukara to iringaullur section of nh966 from km. 61.440 to km.121.006 (design length 59.566 km) (civil package 3 4 5) in the state of kerala in ham mode under bharatmala pariyojana.
Cs for ie for 4 or 6 laning of edathanattukara to iringaullur section of nh966 from km. 61.440 to km.121.006 (design length 59.566 km) (civil package 3 4 5) in the state of kerala in ham mode under bharatmala pariyojana.
Read moreDetailed design consultants for proof checking of civil structural works for corridor of 28.5 km length having 27 stations (millennium city centre to cyber city,) (26.65 km) and spur from basai village to dwarka expressway (1.85 km) of gurugram metro
Detailed design consultants for proof checking of civil structural works for corridor of 28.5 km length having 27 stations (millennium city centre to cyber city,) (26.65 km) and spur from basai village to dwarka expressway (1.85 km) of gurugram metro
Read moreEngagement of architect for preparation of architectural drawings structural design drawings as per is 456 or latest is code including proof checking air conditioning solar system ei ph fire fighting sewage system cctv lan roads other allied services
Engagement of architect for preparation of architectural drawings structural design drawings as per is 456 or latest is code including proof checking air conditioning solar system ei ph fire fighting sewage system cctv lan roads other allied services
Read moreof your Industry type