Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Boiler#5 Start Up And Super Heater Safety Valve Work
|
| Description |
Boiler#5 Start Up And Super Heater Safety Valve Work
|
| Organisation | Tamilnadu Newsprint and Papers Limited | TNPL Unit-1 | TNPL TOS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | 5000 |
| Tender Value | - |
| Place | Tamil Nadu |
| Link | Login to view |
| Start Date | September 29, 2026 00:00 |
| End Date |
Closing soon
16/10/2026
3 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Cogen boiler super heater zone insulation work
Cogen boiler super heater zone insulation work
Read moreSupply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Supply of erosion protection shields for super heater hanger screen tubes and water wall screen tubes in unit ii boiler
Read moreOt 14 removing and refixing the cassette baffle from low temperature super heater ltsh
Removing and refixing the cassette baffle from low temperature super heater ltsh upper bank coils and low temperature reheater ltrh lower bank coils shrouding plates from various places of boiler tubes such that hra fsh and frh
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreSupply of radial seals, bypass seals and spares for air pre heater of unit-xi boiler
Supply of radial seals, bypass seals and spares for air pre heater of unit-xi boiler
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works
Mtps i bm unit ii boiler pressure parts aoh 2026 maintenance of boiler drum and all safety valves and allied works
Read moreTtps mech ii bm unit v cleaning and painting of safety valve silencers vent pipes coutant bottom enclosure structures in boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v cleaning and painting of safety valve silencers vent pipes coutant bottom enclosure structures in boiler during overhaul for the year 2026 2027
Read moreTtpsmechiibmunit iii reconditioning of prds pressure control valve and cbd control valve in unit iii boiler during 20262027 overhaul
Ttpsmechiibmunit iii reconditioning of prds pressure control valve and cbd control valve in unit iii boiler during 20262027 overhaul
Read moreRate contract with bhel trichy for safety valve erv spares for ntpc
Rate contract with bhel trichy for safety valve erv spares for ntpcstations
Read moreProcurement of main control valve (mcv) and auxiliary control valve (acv) of turbine driven boiler feed pump (tdbfp) of stpp, jaipur, mancherial, telangana.
Procurement of main control valve (mcv) and auxiliary control valve (acv) of turbine driven boiler feed pump (tdbfp) of stpp, jaipur, mancherial, telangana.
Read moreof your Industry type