Tender Details
Particulars | Details |
---|---|
Title |
Replacement Of Damaged Roof Sheets Of Reclaimed Yard (Phase 2), Jt 1, Jt 2 And Jt 3 In Cpp At Hwpm
|
Description |
Replacement Of Damaged Roof Sheets Of Reclaimed Yard (Phase 2), Jt 1, Jt 2 And Jt 3 In Cpp At Hwpm
|
Organisation | Heavy Water Board | Central Govt. Ministry/Department |
Tender Id | 2025_HWB_855279_1 |
Reference Number |
HWPM/CIVIL/CPP/NIT/2025/10 |
Tender Fee | 0 |
EMD | 66720 |
Tender Value | |
Place | HWPM |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=899202 |
Start Date | April 07, 2025 14:30 |
End Date |
21/04/2025 ( Expired 52 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Widening and upgradation of road from 2 lane with ps to 4 lane with ps for rectification of black spot id pb 03 189 of series 2017 19 at location km 159.550 pakho kalan on nh 703 in the state of punjab including utility shifting and excluding gst
Read moreProcurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Read moreDesign build four transit hubs cum community complex (thccs) in singtam-1 (lot 1) tadong-1 (lot 2) soreng (lot 3) and gyalshing (lot 4)
Design build four transit hubs cum community complex (thccs) in singtam-1 (lot 1) tadong-1 (lot 2) soreng (lot 3) and gyalshing (lot 4)
Read moreLaying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Laying of pipe line from water supply and exection of other work in different location at site ward no. 38 a.b. road 58 no. pulia etc place file no. 195/25x9/1
Read moreConstruction of cc road and u shape drain at ward no. 2 in different street
Construction of cc road and u shape drain at ward no. 2 in different street
Read morePackage-1, works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw phase-ii solar power park for the development of 1200mw jalaun solar power park under umrepp
Works of boundary survey and marking, gates chain link fencing of pss with compound walls and gates all around the periphery of 2x 300mw (phase-ii) solar power park for the development of 1200mw jalaun solar power park at pathrahi and amrod in jalaun
Read moreUpgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Upgradation and development of 1 nos. at grade junction to grade separator underpass flyover structure of jaipur rajasthan 200 feet bypass junction project at km. 273.600 (delhi jaipur ajmer expressway) in rajasthan on epc mode
Read moreComprehensive maint of dg sets, replacement of filters, avr, canopies, rewinding of alternators, maint of amf panel, lt panel, defective mccb, lt cables alongwith certain road furniture in ins sandhani, nofra, navy nagar and ayudh vihar at ns karanja
Comprehensive maint of dg sets, replacement of filters, avr, canopies, rewinding of alternators, maint of amf panel, lt panel, defective mccb, lt cables alongwith certain road furniture in ins sandhani, nofra, navy nagar and ayudh vihar at ns karanja
Read moreImplementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Implementation of 24x7 w/s project for town planning scheme (t.p. 1, 2, 3 and 4) under jurisdiction of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreConstruction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Construction of underground s/s for town planning scheme (t.p.1, 2, 3 and 4) of (bda) on engineering, procurement and construction (epc) contract including operation and maintenance for a period of five (5) years
Read moreof your Industry type