Tender Details
Particulars | Details |
---|---|
Title |
Con Of Existing Public Convenicence Into Las Gym With Improvements And Providing Equipments In Division 169, Unit 40, Zone 13.
|
Description |
Con Of Existing Public Convenicence Into Las Gym With Improvements And Providing Equipments In Division 169, Unit 40, Zone 13.
|
Organisation | Corporation of Chennai | State Govt. and UT |
Tender Id | 2024_CoC_488752_1 |
Reference Number |
Z.O.13.C.No.C1/3632/2024(3)-2 |
Tender Fee | 0 |
EMD | 16000 |
Tender Value | |
Place | Adyar, Chennai |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=580832 |
Start Date | September 27, 2024 00:10 |
End Date |
03/10/2024 ( Expired 224 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Implementation of a turnkey project for providing voice and data network over ofc with futuristic plan for integration of surveillance equipments on 08 nos ib deployed units under ftr hq jammu
Read moreCs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Cs for preparation of dpr for tech assessment and improvement measures on existing 6 lane udaipur ratanpur shamlaji section km 287.400 to km 401.200 of nh8 and and preparation of dpr for con of new udaipur bypass in rajasthan and gujarat
Read moreRehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Rehabilitation and up.gradation of guhagar chiplun helwak road from existing km 26.890 to 403.610, design km 26.230 to 403.000 nh 166 e length 13.77 km two lanes with paved shoulders configuration in the state of maharashtra on engineering, procureme
Read moreModification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Modification of existing single sealing _12 sectors _ rotary air pre heater to double sealing arrangement _ 24 sectors _ in unit iv aph a and b during forthcoming capital overhaul model 27vit _m_ 72 deg 2000mm
Read moreConstruction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Construction of revetment of tower no. 13 of 132 kv sidcul-jwalapur line cktii associated with 220 kv sub-station sidcul haridwar under 220 kv o and m division sidcul haridwar
Read moreTo hire the 10 nos. vehicle (hydraulic bucket lift with driver cum operator) with working height from 11 mtr.,14/15 mtr. and 18 mtr. from ground through outsourcing for official use of sub division/ division under ds border zone pspcl amritsar
To hire the 10 nos. vehicle (hydraulic bucket lift with driver cum operator) with working height from 11 mtr.,14/15 mtr. and 18 mtr. from ground through outsourcing for official use of sub division/ division under ds border zone pspcl amritsar
Read moreMaintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc
Maintenance work of jabalpur - hiran river section of nh-12 from existing km. 11.4 to 66.4 (design chainage 10.400 to 66.000) in the state of madhya pradesh to four lanes with paved shoulders under nhdp-iii on epc mode on the risk and cost of the epc
Read moreSupply & installation of two electric furnaces with spares and comprehensive amc for 1 year at sru bhilai and sru ranchi road (repair, maintenance, and installation of plant/systems/ equipments (version 2) - manufacturing unit)
Supply & installation of two electric furnaces with spares and comprehensive amc for 1 year at sru bhilai and sru ranchi road (repair, maintenance, and installation of plant/systems/ equipments (version 2) - manufacturing unit)
Read moreNfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit
Nfn/civil/666/2025/03 dated 12/05/2025 providing and laying of pavers on truck / tankers moving area in nitric acid plant inside factory area of nfl nangal unit
Read moreLaying of work of installation of 130 meter 300 mm dia and 248 meter 250 mm dia rcc sewer hume pipe and construction of 37 manhole chambers, road reinstatement and providing 70 house connections in various streets of ward-40 mo. satipur
Laying of work of installation of 130 meter 300 mm dia and 248 meter 250 mm dia rcc sewer hume pipe and construction of 37 manhole chambers, road reinstatement and providing 70 house connections in various streets of ward-40 mo. satipur
Read moreof your Industry type