Tender Details

Particulars Details
Title
Strengthening Of Mk Road To Kadugupattu Colony Road Km 0 0 To 1 60 In Kadukupattu Village Panchayat In Lathur Panchayat Union Of Chengalpattu District Under Nabard Xxxi Tranche Having Pkg No.03
Description
Strengthening Of Mk Road To Kadugupattu Colony Road Km 0 0 To 1 60 In Kadukupattu Village Panchayat In Lathur Panchayat Union Of Chengalpattu District Under Nabard Xxxi Tranche Having Pkg No.03
Organisation Rural Development and Panchayat Raj Department | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 0
EMD 89000
Tender Value
Place Lathur
Link

AAAAAAAAAA

Login to view
Start Date June 11, 2025 00:25
End Date

25/06/2025 ( 12 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.

Read more
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector

Read more
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif

Read more
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.

Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.

Read more
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039

Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039

Read more
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.

Read more
Annual surfacing on link road to village khatnol km. 0/00 to 10/000

Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road

Read more
Improvement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan

Improvement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan

Read more
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise