Tender Details
Particulars | Details |
---|---|
Title |
Strengthening Of Mk Road To Kadugupattu Colony Road Km 0 0 To 1 60 In Kadukupattu Village Panchayat In Lathur Panchayat Union Of Chengalpattu District Under Nabard Xxxi Tranche Having Pkg No.03
|
Description |
Strengthening Of Mk Road To Kadugupattu Colony Road Km 0 0 To 1 60 In Kadukupattu Village Panchayat In Lathur Panchayat Union Of Chengalpattu District Under Nabard Xxxi Tranche Having Pkg No.03
|
Organisation | Rural Development and Panchayat Raj Department | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 89000 |
Tender Value | |
Place | Lathur |
Link |
AAAAAAAAAA Login to view |
Start Date | June 11, 2025 00:25 |
End Date |
25/06/2025 ( 12 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConstruction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Construction and up-gradation to two lane with paved shoulder in km 90.990 to 98.160 total length 7.170 km kutul to nilangur maharashtra border road of nh-130d pkg-4 (part-1) in the state of chhattisgarh.
Read moreImprovement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Improvement and bituminous work on tugdunda-bhaiswara motor road (km 0.000 to 5.000) in pauri constituency of pauri gharwal district under state sector
Read moreStrengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Strengthening work by dbm bc in marchula sarikhet bajro pokhda stpuli pauri motor road sh 32 in km 41 to 75.500 in almora district under central road and infrastructure fund crif
Read moreUnder crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Under crif (under the honorable cm announcement no.182/2021) widening/strengthening of nandprayag to ghat bazar(block) motor road km 01 to km 18.550 into intermediate lane in block- nandanagar, constituency assembly- tharali, district- chamoli.
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu (job no. nh-38-tn-2024-25-1039
Read moreDalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Dalkhola town road (old nh-34) from ch. 447.740 km to ch. 452.140 km surfacing work under uttar dinajpur division, pwd in the district of uttar dinajpur during the year 2024-25.
Read moreAnnual surfacing on link road to village khatnol km. 0/00 to 10/000
Providing and laying 25 mm thick bituminous concrete along with providing and laying of hot applied thermoplastic compound 2.50 mm thick for edge line in between km. 8/00 to 9/00 ) add. kms. under amp 2025-26- village road
Read moreImprovement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan
Improvement such as widening and strengthening of rayagada-kerada road (mdr-48b) from 0/000 km to 25/166 km in the district of rayagada under state plan
Read moreNew construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
New construction work and hill side cutting and muck disposal work of jal band to chilon motor road ch.km 1 to km 2 under the construction work of 36 m span steel girder bridge at km 1 in distt. rudraprayag under honble c.m. announcement no. 365/2022
Read moreof your Industry type