Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Arjun Table Hard Top Folding For Class Room
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/3695137 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | July 14, 2023 23:28 |
| End Date |
Expired
24/07/2023
Expired 1175 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | KHALID ENTERPRISES | - | 25-07-2023 07:12:00 | N/A | Qualified |
| 2 | NEW GLOBAL ENGINEERS | - | 25-07-2023 08:28:30 | N/A | Qualified |
| 3 | SAJAD TRADERS | - | 25-07-2023 07:30:53 | N/A | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | KHALID ENTERPRISES | Item Categories : Arjun table hard top folding for class room | 23100.00 | L1 |
| 2 | SAJAD TRADERS | Item Categories : Arjun table hard top folding for class room | 25200.00 | L2 |
| 3 | NEW GLOBAL ENGINEERS | Item Categories : Arjun table hard top folding for class room | 28800.00 | L3 |
33kv ht tvr net meter -/1a dlms cat-c 0.2s class
33kv ht tvr net meter -/1a dlms cat-c 0.2s class
Read moreRoof top rain water harvesting work for type-3 houses in chitrakoot district
Roof top rain water harvesting work for type-3 houses in chitrakoot district
Read more33kv current transformers of ratio 100/1a, 0.2s class for ht metering
33kv current transformers of ratio 100/1a, 0.2s class for ht metering
Read moreConstruction of one additional class room at m.s. madhopur, block- benipur, district- darbhanga
Construction of one additional class room at m.s. madhopur, block- benipur, district- darbhanga
Read moreConstruction of one additional class room at u.m.s. baikathpurpur, block- khushrupur, district- patna
Construction of one additional class room at u.m.s. baikathpurpur, block- khushrupur, district- patna
Read moreConstruction of one additional class room at u.m.s. rasoolpur, block- hayaghat, district- darbhanga
Construction of one additional class room at u.m.s. rasoolpur, block- hayaghat, district- darbhanga
Read moreConstruction of one additional class room at m.s. barhauna, block- chandi, district- nalanda
Construction of one additional class room at m.s. barhauna, block- chandi, district- nalanda
Read moreDrilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreof your Industry type