Tender Details
Particulars | Details |
---|---|
Title |
Tender For Construction Of Flood Protection Retaining Wall With Canal Bedlining For The Di Canal From Kilpauk Garden Road To Otteri Nullah In Dn.101 Zone 8
|
Description |
Tender For Construction Of Flood Protection Retaining Wall With Canal Bedlining For The Di Canal From Kilpauk Garden Road To Otteri Nullah In Dn.101 Zone 8
|
Organisation | Corporation of Chennai | State Govt. and UT |
Tender Id | 2025_CoC_530194_1 |
Reference Number |
SWDC.No.B2/0670-3/2025 |
Tender Fee | 0 |
EMD | 3.63 Lakh |
Tender Value | |
Place | CHENNAI |
Link | https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=631240 |
Start Date | March 06, 2025 22:50 |
End Date |
11/03/2025 ( Expired 42 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read morePreparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Preparation of dpr including land acquisition and forest clearance for construction of road tungri samchung tsela mago from new to nhsl specifications (indicative length 60 kms) under project vartak in state of arunachal pradesh
Read moreWidening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreAnnual contract for loading and transportation of coal by road with dumper/ tipper/hywa from different collieries of ccl/ bccl to btps coal yard in the distance slab of (05-25 km and 26-50 km
Annual contract for loading and transportation of coal by road with dumper/ tipper/hywa from different collieries of ccl/ bccl to btps coal yard in the distance slab of (05-25 km and 26-50 km
Read moreConstruction of bt road, cc road, paved shoulder, drain and protection wall form model road to zone 2 hilly area chhindwara
Construction of bt road, cc road, paved shoulder, drain and protection wall form model road to zone 2 hilly area chhindwara
Read moreIn ward number 27 mathurapur, agreement with martyrdom from mubarak to latif, kallu to ram narayan and link, pipe in the neck and reason for construction of cc road. stop.
In ward number 27 mathurapur, agreement with martyrdom from mubarak to latif, kallu to ram narayan and link, pipe in the neck and reason for construction of cc road. stop.
Read moreSpecial repair of various link roads under repair programme 2022 23 2023 24 and 2024 25 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etcwith 5year maintance in mc ptk
Special repair of various link roads under repair programme 2022 23 2023 24 and 2024 25 from compaction of earth work up to road structure including premix carpet culverts drains and retaining wall etcwith 5year maintance in mc ptk gr10
Read moreConstruction of retaining wall along the kunjan odai from sembiyapalayam road culvert downstream to river guduvaiyar confluence point at sembiyapalayam in villianur commune, puducherry.
Construction of retaining wall along the kunjan odai from sembiyapalayam road culvert downstream to river guduvaiyar confluence point at sembiyapalayam in villianur commune, puducherry.
Read moreof your Industry type