Tender Details

Particulars Details
Title
As Id 1014 For Horticulture Work Of Central Verge And Green Belt From Suraj Kund Chowk To Ankhir Chowk To T Point Gurugram Road, Faridabad
Description
Horticulture Work Of Central Verge And Green Belt From Suraj Kund Chowk To Ankhir Chowk To T Point Gurugram Road, As Id 1014 Faridabad
Organisation Haryana Government | State Govt. and UT
Tender Id 2024_HRY_370077_1
Reference
Number
202449E1953D A76D 45F2 B5B2 FA13C8F2244A1874002
Tender Fee 2360
EMD 2.55 Lakh
Tender Value
Place Faridabad (MC)
Link https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=445871
Start Date March 16, 2024 21:00
End Date

02/04/2024 ( Expired 424 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.

Read more
Ward no. 27 construction of c.c. road and drain work from ravi katare house to ambaram ji house

Ward no. 27 construction of c.c. road and drain work from ravi katare house to ambaram ji house

Read more
Irqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26

Irqp work of jamtara to nirsa via birgram road from (ch. 15300m to 24000m) total length- 8.70 km for the year 2025-26

Read more
Cwe bly/ge(e)/04 of 25-26 spl repair to internal road from office area to aps gate, aps gate to mi room chowk, single offrs md accn and wksp, a charge main gate to a charge animal lines and between brake stable to fariery shop at rts and depot hempur

Cwe bly/ge(e)/04 of 25-26 spl repair to internal road from office area to aps gate, aps gate to mi room chowk, single offrs md accn and wksp, a charge main gate to a charge animal lines and between brake stable to fariery shop at rts and depot hempur

Read more
Rejuvenation and widening (bituminous work), paver block work, r.c.c. drain cover and plantation of c.c. road form main road to bad chowk to sanjay trivedi house, pipla narayanwar

Rejuvenation and widening (bituminous work), paver block work, r.c.c. drain cover and plantation of c.c. road form main road to bad chowk to sanjay trivedi house, pipla narayanwar

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Consultancy services for preparation of detailed project report (dpr) for elevated corridor for connectivity from aiims to mahipalpur bypass project with further extension to gurgaon- faridabad road.

Consultancy services for preparation of detailed project report (dpr) for elevated corridor for connectivity from aiims to mahipalpur bypass project with further extension to gurgaon- faridabad road.

Read more
Under the state plan, strengthening and damrikaran work from km 1 to 4 of kandiyalgaon motor road from km 7 of purola gundiyatgaon development block of purola assembly constituency of district uttarkashi. (including maintenance of 3 year)

Under the state plan, strengthening and damrikaran work from km 1 to 4 of kandiyalgaon motor road from km 7 of purola gundiyatgaon development block of purola assembly constituency of district uttarkashi. (including maintenance of 3 year)

Read more
Consultancy services for preparation of dpr to mitigate the bottlenecks from punjab/ut border near zirakpur flyover to poultry farm chowk including de-congestion of old airport chowk, halo majra t-point and poultry farm chowk on nh-05 (approx. length

Consultancy services for preparation of dpr to mitigate the bottlenecks from punjab/ut border near zirakpur flyover to poultry farm chowk including de-congestion of old airport chowk, halo majra t-point and poultry farm chowk on nh-05 (approx. length

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise