Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Contract Work For Non Destructive Testing (Ndt) Of Lhb Wheel Sets Using Eddy Current Array (Eca) At Coaching Depot Bhuj &Amp Gandhidham For Two Years.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 79363828 |
Reference Number |
M442-NDT-GIM-BHUJ-23-24R |
Tender Fee | 0 |
EMD | 1.32 Lakh |
Tender Value | |
Place | Mumbai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/012025/79363828/viewNitPdf_4824142.pdf |
Start Date | January 09, 2025 21:34 |
End Date |
31/01/2025 ( Expired 137 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design manufacture supply installation testing commissioning of 17 nos led based solar street lighting systems of two arms model at siridao beach tiswadi in north goa district with comprehensive maintenance contract for 05 years
Design manufacture supply installation testing commissioning of 17 nos led based solar street lighting systems of two arms model at siridao beach tiswadi in north goa district with comprehensive maintenance contract for 05 years
Read moreAnnual contract for supply of skilled, semi-skilled and un-skilled manpower for miscellaneous work at bktpp for two years
Annual contract for supply of skilled, semi-skilled and un-skilled manpower for miscellaneous work at bktpp for two years
Read moreWork contract for providing 15 nos. of iti qualified operators for three shifts on contract basis for operation of milk pouch machines at sholinganallur dairy for two years
Work contract for providing 15 nos. of iti qualified operators for three shifts on contract basis for operation of milk pouch machines at sholinganallur dairy for two years
Read moreWork of comprehensive operation and maintenance contract of air pollution control system at j.s.s. hindu cemetery phase i in c ward for two years.
Work of comprehensive operation and maintenance contract of air pollution control system at j.s.s. hindu cemetery phase i in c ward for two years.
Read moreComprehensive annual maintenance contract (amc) and fms of architectural infrastructure work at data center (dc), dehradun and disaster recovery center (dr), haldwani for the period of two years
Comprehensive annual maintenance contract (amc) and fms of architectural infrastructure work at data center (dc), dehradun and disaster recovery center (dr), haldwani for the period of two years
Read moreMaintenance contract for electrical maintenance work at inside power house area under emiph department, stps for 2(two) years
Maintenance contract for electrical maintenance work at inside power house area&#x0d under emiph department, stps for 2(two) years
Read moreSurvey design fabrication supply installation testing and commissioning of total 78.68 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 5 years
Survey design fabrication supply&#x0d installation testing commissioning of total 78.68 kwp of on grid connected rooftop solar pv power plant including comprehensive maintenance contract cmc for 5 years at chirekhani karti teh tiroda dist gond
Read moreNon comprehensive maintenance contract for operation and maintenance of electrical installations at esd-i, iii and 33kv muss and acs and water coolers for a period of two years
Non comprehensive maintenance contract for operation and maintenance of electrical installations at esd-i, iii and 33kv muss and acs and water coolers for a period of two years
Read moreWork of comprehensive operation and maintenance contract of air pollution control system at j.s.s. hindu cemetery phase ii in c ward for two years.
Work of comprehensive operation and maintenance contract of air pollution control system at j.s.s. hindu cemetery phase ii in c ward for two years.
Read moreSurvey design fabrication supply installation testing commissioning of ongrid solar rooftop project with net meter and rms of 50 kw at msrtc bus depot indapur pune with comprehensive maintenance contract cmc for 5 years
Survey design fabrication supply installation testing commissioning of ongrid solar rooftop project with net meter and rms of 50 kw at msrtc bus depot indapur pune with comprehensive maintenance contract cmc for 5 years
Read moreof your Industry type