Tender Details

Particulars Details
Title
Construction Of Concrete Buttresses And Lateritic Stone Pitching Below Xelpem Clear Water Reservoir Slopes At The 160 Mld Salauli Wtp. L2
Description
Construction Of Concrete Buttresses And Lateritic Stone Pitching Below Xelpem Clear Water Reservoir Slopes At The 160 Mld Salauli Wtp.
Organisation PUBLIC WORKS DEPARTMENT | State Govt. and UT
Tender Id 2025_PWD_19855_1
Reference
Number
48-1/PWD-WD XII-ASW/2024-25/07 L2
Tender Fee 12000
EMD 70998
Tender Value
Place Executive Engineer PWD WD XII Sanguem-Goa
Link https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=20289
Start Date February 06, 2025 23:30
End Date

13/02/2025 ( Expired 127 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement

Read more
Comprehensive running / operation and maintenance of 120 mld wtp, ptw, raw clear water conveyance mains, horticulture works, supply of consumables and other appurtenant works under 50 cusec water supply scheme, pratap vihar, gha

Comprehensive running / operation and maintenance&amp#x0d of 120 mld wtp, primary treatment works, raw &amp#x0d clear water conveyance mains, horticulture works,&amp#x0d supply of consumables and other appurtenant works&amp#x0d under 50 cusec water supply scheme,&amp#x0d pratap vihar,

Read more
Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex

Construction of buttress wall beside 14 service center below the active waste dump 40 mtr and 30 mtr in length at dep 14 biom kirandul complex

Read more
Cleaning of overhead water tanks, post construction anti termite treatment (att) and certain petty repairs to md and otm accn at shahjahanpur cantt under ge (east) bareilly

Cleaning of overhead water tanks, post construction anti termite treatment (att) and certain petty repairs to md and otm accn at shahjahanpur cantt under ge (east) bareilly

Read more
Construction of 2.0mld water treatment plant and other related works including operation and maintenance for a period of 5 years (part-2) at bilga town, district jalandhar, punjab under amrut 2.0 scheme.

Construction of 2.0mld water treatment plant and other related works including operation and maintenance for a period of 5 years (part-2) at bilga town, district jalandhar, punjab under amrut 2.0 scheme.

Read more
Construction of cement concrete road along with drains and box culverts in phase 4 (godown no. 36, 42, 56, 57 and 58) at fci fsd borivali, mumbai

Construction of cement concrete road along with drains and box culverts in phase 4 (godown no. 36, 42, 56, 57 and 58) at fci fsd borivali, mumbai

Read more
Construction of drains for passing storm water and laying of hume pipes at urea, abc, urea bagg plants in rcf factory at chembur, mumbai- 400074

Construction of drains for passing storm water and laying of hume pipes at urea, abc, urea bagg plants in rcf factory at chembur, mumbai- 400074

Read more
Boulder pitching and concreting peripheri of central store open yard, new open yard, hydrogen plant build and raw water pump house build at dstps, dvc, andal.

Boulder pitching and concreting peripheri of central store open yard, new open yard, hydrogen plant build and raw water pump house build at dstps, dvc, andal.

Read more
Special repair to water supply lines by replacing ci to di pipes at subroto marg (phase-i) and replacement of ber equipment at afs begumpet under ge (af) hakimpet

Special repair to water supply lines by replacing ci to di pipes at subroto marg (phase-i) and replacement of ber equipment&#x0d at afs begumpet under ge (af) hakimpet&#x0d

Read more
Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years part 2 at bhadson town, district patiala, punjab under amrut 2.0 scheme

Canal water based water supply project for construction of 2.0 mld water treatment plant and other related works including operation and maintenance for a period of 5 years part 2 at bhadson town, district patiala, punjab under amrut 2.0 scheme

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise